High Voltage Test Solutions
Persistently developing technology, improving quality, management, and service standards

Cylinder Type

HFRS 800kV/3200kVA Resonant Test System: Dual-Module Solution for Ultra High Voltage Testing

Technical specifications and field applications of the HFRS 800kV/3200kVA dual-module resonant test system with 880kV withstand capability for ultra high voltage equipment certification.


  • US$ 131,148.00
  • Lead time: 90 days

>>>WhatsApp Communication<<<

Product Details

Product Tags

HFRS 800kV/3200kVA Resonant Test System: Dual-Module Solution for Ultra High Voltage Testing

Dual-Module Configuration Specifications

ParameterSingle ModuleSeries Connection
Rated Voltage400kV800kV
Rated Power1600kVar3200kVar
Inductance318H ±2%636H ±2%
Rated Current4A4A
Withstand Voltage440kV880kV/1min

Key Performance Characteristics

  • Frequency Range: 30-300Hz operational bandwidth

  • Quality Factor: Q≥60 at 50Hz

  • Thermal Performance:

    • Winding temperature rise: ≤80K

    • Transformer oil rise: ≤55K

    • Epoxy tube surface: ≤40K

  • Duty Cycle: 15 minutes ON / 1 hour OFF (4 cycles per day)

Advanced Engineering Features

Magnetic Circuit Design

  • Precision air-gapped iron core design

  • High-purity copper windings with ±2% tolerance

  • 318H base inductance per module

Thermal Management System

  • Oil-immersed self-cooling with iron tank

  • Breather capsule for oil expansion control

  • Optimized heat dissipation channels

Field Deployment Advantages

  • Shock-resistant transport design (5G certified)

  • Integrated lifting hooks (8-ton capacity)

  • Dual-configuration nameplates

  • IP55-rated all-weather enclosure

Performance Comparison

FeatureHFRS Metal TankStandard Epoxy
Maximum Voltage880kVTypically 650kV
Heat Dissipation55K oil rise70K+ typical
Transport Durability5G shock resistant2G limit

Typical Applications

1. Ultra High Voltage Cable Testing

  • 800kV AC withstand testing

  • Partial discharge measurement

2. EHV Transformer Testing

  • Winding deformation analysis

  • Lightning impulse simulation

3. GIS Field Commissioning

  • 880kV withstand verification

  • Three-phase simultaneous testing

Operational Guidelines

Safety Protocols

  • Maintain 12m clearance during 800kV tests

  • Implement dual-point grounding

Maintenance Requirements

  • Monthly oil dielectric tests

  • Annual winding resistance checks

>>>WhatsApp Communication<<<

>>>Click To Get Quote<<<

Leave Your Message

Leave Your Message