HFRS 1000kV/8000kVA Modular Resonant Test System: Quad-Module Solution for UHV Testing Applications
Flexible Four-Module Configuration
Configuration | Voltage Rating | Power Rating | Inductance | Current | Withstand Voltage |
---|---|---|---|---|---|
Single Module | 250kV | 2000kVar | 90H ±2.5% | 8A | 275kV/1min |
Four Modules (Series) | 1000kV | 8000kVar | 360H ±2.5% | 8A | 1100kV/1min |
Key Performance Parameters
Frequency Range: 20-300Hz operational bandwidth
Quality Factor: Q≥40 across full frequency range
Thermal Performance:
Winding temperature rise: ≤65K
Transformer oil rise: ≤55K
Epoxy tube surface: ≤40K
Duty Cycle: 30 minutes ON / 30 minutes OFF (15 cycles/day)
Precision: ±2.5% inductance tolerance
Advanced Engineering Features
Magnetic Circuit Design
Four identical 250kV reactor modules
Segmented air gap iron core construction
High-conductivity copper windings
Precision-matched inductance values
Thermal Management System
Oil-immersed self-cooling design
Iron shell structure for optimal heat dissipation
Integrated breather capsule for oil expansion
Military-grade epoxy insulation
Field Deployment Advantages
Transport-optimized for rail/road (5G vibration rated)
Heavy-duty suspension hooks (10-ton capacity)
Configuration-specific nameplates
All-weather metal enclosure (IP55 rated)
Performance Comparison
Feature | HFRS Metal Tank | Conventional Designs |
---|---|---|
Maximum Voltage | 1100kV | Typically 800kV |
Power Capacity | 8000kVar | Typically 4000kVar |
Duty Cycle | 15 cycles/day | Typically 4-6 cycles |
Typical Applications
1. UHV Transformer Testing
1000kV AC withstand testing
Frequency response analysis
2. GIS Field Commissioning
1100kV withstand verification
Three-phase simultaneous testing
3. High Power Laboratory Testing
Dielectric material evaluation
High voltage component testing
Operational Guidelines
Safety Protocols
Maintain 15m clearance during 1000kV tests
Implement multi-point grounding system
Continuous thermal monitoring required
Maintenance Schedule
Pre-test visual inspections
Monthly oil dielectric tests
Annual full system calibration
Breather capsule inspection every 500 hours