High Voltage Test Solutions
Persistently developing technology, improving quality, management, and service standards

Cylinder Type

HFRS 1000kV/8000kVA Modular Resonant Test System: Quad-Module Solution for UHV Testing Applications

Technical specifications of the HFRS 1000kV/8000kVA four-module resonant test system with flexible configuration options and 1100kV withstand capability for ultra high voltage equipment testing.


  • US$1.00; Negotiated Price
  • Lead time: 120days

>>>WhatsApp Communication<<<

Product Details

Product Tags

HFRS 1000kV/8000kVA Modular Resonant Test System: Quad-Module Solution for UHV Testing Applications

Flexible Four-Module Configuration

ConfigurationVoltage RatingPower RatingInductanceCurrentWithstand Voltage
Single Module250kV2000kVar90H ±2.5%8A275kV/1min
Four Modules (Series)1000kV8000kVar360H ±2.5%8A1100kV/1min

Key Performance Parameters

  • Frequency Range: 20-300Hz operational bandwidth

  • Quality Factor: Q≥40 across full frequency range

  • Thermal Performance:

    • Winding temperature rise: ≤65K

    • Transformer oil rise: ≤55K

    • Epoxy tube surface: ≤40K

  • Duty Cycle: 30 minutes ON / 30 minutes OFF (15 cycles/day)

  • Precision: ±2.5% inductance tolerance

Advanced Engineering Features

Magnetic Circuit Design

  • Four identical 250kV reactor modules

  • Segmented air gap iron core construction

  • High-conductivity copper windings

  • Precision-matched inductance values

Thermal Management System

  • Oil-immersed self-cooling design

  • Iron shell structure for optimal heat dissipation

  • Integrated breather capsule for oil expansion

  • Military-grade epoxy insulation

Field Deployment Advantages

  • Transport-optimized for rail/road (5G vibration rated)

  • Heavy-duty suspension hooks (10-ton capacity)

  • Configuration-specific nameplates

  • All-weather metal enclosure (IP55 rated)

Performance Comparison

FeatureHFRS Metal TankConventional Designs
Maximum Voltage1100kVTypically 800kV
Power Capacity8000kVarTypically 4000kVar
Duty Cycle15 cycles/dayTypically 4-6 cycles

Typical Applications

1. UHV Transformer Testing

  • 1000kV AC withstand testing

  • Frequency response analysis

2. GIS Field Commissioning

  • 1100kV withstand verification

  • Three-phase simultaneous testing

3. High Power Laboratory Testing

  • Dielectric material evaluation

  • High voltage component testing

Operational Guidelines

Safety Protocols

  • Maintain 15m clearance during 1000kV tests

  • Implement multi-point grounding system

  • Continuous thermal monitoring required

Maintenance Schedule

  • Pre-test visual inspections

  • Monthly oil dielectric tests

  • Annual full system calibration

  • Breather capsule inspection every 500 hours

>>>WhatsApp Communication<<<

>>>Click To Get Quote<<<

Leave Your Message

Leave Your Message