HFRS 750kV/4500kVA Resonant Test System: Triple-Module Design for High Voltage Field Testing
Flexible Three-Module Configuration
The HFRS system offers unparalleled configuration versatility with three independent 250kV modules:
Parameter | Single Module | Serial Connection | Parallel Connection |
---|---|---|---|
Rated Voltage | 250kV | 750kV | 250kV |
Rated Capacitance | 1500kVar | 1500kVar | 4500kVar |
Inductance | 150H ±2% | 450H | 50H |
Rated Current | 6A | 6A | 18A |
Critical Performance Specifications
Frequency Range: 30-300Hz operational bandwidth (44Hz rated)
Insulation Withstand:
Module: 275kV/1min
Pedestal-ground: 30kV/5min
Quality Factor: Q≥80 at 44Hz
Partial Discharge: <10pC at rated voltage
Thermal Performance:
Winding temperature rise: ≤80K
Transformer oil rise: ≤55K
Epoxy tube surface: <40K
Continuous Operation: 1 hour at full rated power
Advanced Engineering Design
Core Technology
Precision-engineered magnetic circuit with:
Segmented air gap iron core
High-purity copper windings
±2% inductance tolerance
Thermal Management System
Oil-immersed self-cooling design features:
Iron shell construction for maximum heat dissipation
Breather capsule for oil expansion control
Military-grade epoxy insulation
Field Deployment Features
Shock-absorbing transport design (rail/road certified)
Integrated suspension hooks (5-ton rated)
Dual-configuration nameplates (serial/parallel)
All-weather metal enclosure (IP54 rated)
Performance Comparison
Characteristic | Metal Tank Design | Epoxy Tube Design |
---|---|---|
Heat Dissipation | 55K max oil temperature | Typically 65K+ |
Transport Vibration | Withstands 3G acceleration | 1G limit |
Partial Discharge | <10pC guaranteed | Usually 15-20pC |
Field Serviceability | Front-access panels | Full disassembly required |
Typical Test Applications
1. Extra High Voltage Cable Testing
Ideal for 400kV-750kV cable systems:
Partial discharge localization
Tan delta measurement at operational voltage
2. Power Transformer Testing
Comprehensive diagnostic capabilities:
750kV AC withstand testing
Frequency response analysis
3. GIS Commissioning
Essential for gas-insulated switchgear:
Three-phase simultaneous testing
SF6 density monitoring during tests
Operational Protocols
Safety Requirements
Maintain 8m clearance during 750kV tests
Ground all modules before reconfiguration
Monitor oil temperature continuously
Maintenance Schedule
Monthly: Visual inspection of bushings
Quarterly: Oil dielectric strength test
Annual: Full winding resistance test
After 10 transports: Structural integrity check
This three-module resonant test system sets new standards for high voltage field testing, combining unmatched flexibility with laboratory-grade precision in field-deployable packages.