Cylinder Type
HFRS 1000kV/3000kVA Resonant Test System: Dual-Module Solution for UHV Equipment Testing
System Configuration Options
Parameter | Single Module | Series Connection |
---|---|---|
Rated Voltage | 500kV | 1000kV |
Rated Power | 1500kVar | 3000kVar |
Inductance | 400H | 800H ±2% |
Rated Current | 3A | 3A |
Withstand Voltage | 550kV | 1100kV/1min |
Key Performance Specifications
Frequency Range: 30-300Hz operational bandwidth
Quality Factor: Q≥40 at 50Hz
Partial Discharge: ≤10pC at 100% Uh (factory test conditions)
Thermal Performance:
Winding temperature rise: ≤80K
Transformer oil rise: ≤55K
Epoxy tube surface: ≤40K
Continuous Operation: 60 minutes at 100% rated voltage and current
Advanced Engineering Design
Magnetic Circuit Design
Segmented air gap iron core construction
High-purity copper windings with ±2% tolerance
Precision 800H inductance in series configuration
Thermal Management System
Oil-immersed self-cooling with iron tank
Optimized heat dissipation channels
Integrated breather capsule for oil expansion
Field Deployment Features
Transport-optimized for rail/road (5G shock rated)
Heavy-duty suspension hooks (10-ton capacity)
Dual-configuration nameplates
IP55-rated weatherproof enclosure
Performance Comparison
Feature | HFRS Metal Tank | Epoxy Tube Design |
---|---|---|
Maximum Voltage | 1100kV | Typically 800kV |
Heat Dissipation | 55K max oil rise | 70K+ typical |
Current Capacity | Continuous 3A | Typically intermittent |
Typical Applications
1. UHV Transformer Testing
1000kV AC withstand testing
Lightning impulse simulation
2. GIS Commissioning
1100kV withstand verification
Three-phase simultaneous testing
3. Research Laboratory Use
High voltage component testing
Dielectric material evaluation
Operational Guidelines
Safety Protocols
Maintain 15m clearance during 1000kV tests
Dual-point grounding mandatory
Continuous temperature monitoring required
Maintenance Requirements
Monthly oil dielectric tests
Annual winding resistance verification
Breather capsule inspection every 500 hours