High Voltage Test Solutions
Persistently developing technology, improving quality, management, and service standards

Cylinder Type

HFRS 1000kV/3000kVA Resonant Test System: Dual-Module Solution for UHV Equipment Testing

Technical specifications of the HFRS 1000kV/3000kVA dual-module resonant test system with 1100kV withstand capability for ultra high voltage equipment testing and certification.


  • US$1.00; Negotiated Price
  • Lead time: 120days

>>>WhatsApp Communication<<<

Product Details

Product Tags

HFRS 1000kV/3000kVA Resonant Test System: Dual-Module Solution for UHV Equipment Testing

System Configuration Options

ParameterSingle ModuleSeries Connection
Rated Voltage500kV1000kV
Rated Power1500kVar3000kVar
Inductance400H800H ±2%
Rated Current3A3A
Withstand Voltage550kV1100kV/1min

Key Performance Specifications

  • Frequency Range: 30-300Hz operational bandwidth

  • Quality Factor: Q≥40 at 50Hz

  • Partial Discharge: ≤10pC at 100% Uh (factory test conditions)

  • Thermal Performance:

    • Winding temperature rise: ≤80K

    • Transformer oil rise: ≤55K

    • Epoxy tube surface: ≤40K

  • Continuous Operation: 60 minutes at 100% rated voltage and current

Advanced Engineering Design

Magnetic Circuit Design

  • Segmented air gap iron core construction

  • High-purity copper windings with ±2% tolerance

  • Precision 800H inductance in series configuration

Thermal Management System

  • Oil-immersed self-cooling with iron tank

  • Optimized heat dissipation channels

  • Integrated breather capsule for oil expansion

Field Deployment Features

  • Transport-optimized for rail/road (5G shock rated)

  • Heavy-duty suspension hooks (10-ton capacity)

  • Dual-configuration nameplates

  • IP55-rated weatherproof enclosure

Performance Comparison

FeatureHFRS Metal TankEpoxy Tube Design
Maximum Voltage1100kVTypically 800kV
Heat Dissipation55K max oil rise70K+ typical
Current CapacityContinuous 3ATypically intermittent

Typical Applications

1. UHV Transformer Testing

  • 1000kV AC withstand testing

  • Lightning impulse simulation

2. GIS Commissioning

  • 1100kV withstand verification

  • Three-phase simultaneous testing

3. Research Laboratory Use

  • High voltage component testing

  • Dielectric material evaluation

Operational Guidelines

Safety Protocols

  • Maintain 15m clearance during 1000kV tests

  • Dual-point grounding mandatory

  • Continuous temperature monitoring required

Maintenance Requirements

  • Monthly oil dielectric tests

  • Annual winding resistance verification

  • Breather capsule inspection every 500 hours

>>>WhatsApp Communication<<<

>>>Click To Get Quote<<<

Leave Your Message

Leave Your Message