Cylinder Type
HFRS 700kV/6300kVA Resonant Test System: Dual-Module High Voltage Testing Solution
Dual-Module Configuration Options
The system offers flexible testing configurations with two 350kV modules:
Parameter | Single Module | Series Connection |
---|---|---|
Rated Voltage | 350kV | 700kV |
Rated Power | 3150kVA | 6300kVA |
Inductance | 123H ±2% | 246H ±2% |
Rated Current | 9A | 9A |
Withstand Voltage | 385kV | 770kV/1min |
Key Performance Specifications
Frequency Range: 25-300Hz operational bandwidth
Thermal Performance:
Winding temperature rise: ≤80K
Transformer oil rise: ≤55K
Epoxy tube surface: ≤40K
Duty Cycle: 15 minutes ON / 1 hour OFF (4 cycles per day)
Partial Discharge: <10pC at rated voltage
Quality Factor: Q≥80 at rated frequency
Advanced Engineering Design
Magnetic Circuit Design
Precision-engineered components ensure optimal performance:
Segmented air gap iron core for linear inductance
High-purity copper windings with ≤2% tolerance
Precision-tuned 123H inductance per module
Thermal Management System
Advanced cooling features include:
Oil-immersed self-cooling design
Iron shell construction for maximum heat dissipation
Breather capsule for oil expansion compensation
Military-grade epoxy insulation system
Field Deployment Features
Heavy-duty transport design (rail/road certified)
Integrated suspension hooks (10-ton capacity)
Dual-configuration nameplates (single/series)
All-weather metal enclosure (IP55 rated)
Performance Advantages
Feature | HFRS Metal Tank | Conventional Epoxy |
---|---|---|
Heat Dissipation | 55K max oil temp | 70K+ typical |
Transport Durability | Withstands 5G shocks | 2G limit |
Voltage Withstand | 770kV certified | Typically 650kV max |
Field Maintenance | Front-access service | Full disassembly needed |
Typical Test Applications
1. EHV Cable Systems Testing
Comprehensive testing for 500kV-765kV cables:
700kV AC withstand testing
Partial discharge mapping
Tan delta measurement at operational voltage
2. GIS and GIL Commissioning
Essential for gas-insulated equipment:
Three-phase simultaneous testing capability
SF6 density monitoring during tests
770kV lightning impulse simulation
3. Power Transformer Testing
Factory and field diagnostic applications:
Frequency response analysis
Winding deformation detection
Full power factor testing
Operational Guidelines
Safety Protocols
Maintain 10m clearance during 700kV tests
Implement dual-point grounding during configuration changes
Continuous oil temperature monitoring required
Maintenance Schedule
Pre-test: Visual inspection of bushings and connections
Monthly: Oil dielectric strength verification
Annual: Full winding resistance measurement
After 5 transports: Structural integrity inspection
This 700kV/6300kVA resonant test system represents the pinnacle of high voltage testing technology, delivering laboratory-grade precision in rugged field-deployable packages for utility-scale applications.