600kV ~ 800kV Range
LQHVF 750kV/1000pF Coupling Capacitor & Capacitive Voltage Divider
Engineered for precision in ultra-high-voltage systems, the LQHVF 750kV/1000pF dual-stage capacitor delivers exceptional partial discharge performance and measurement accuracy. Featuring industry-leading PD levels as low as 3pC at 600kV and a precision 3000:1 ratio, this solution enables laboratory-grade performance in substation monitoring and high-voltage testing applications.
Technical Specifications
Electrical Parameters
Rated Voltage: 750kV AC
System Capacitance: 1000pF
Stage Configuration: 2×375kV (2000pF per unit)
Frequency: 50Hz
Dividing Ratio: 3000:1 nominal
Performance Metrics
Accuracy: ≤±1% full scale
Dielectric Loss: <0.2%
Insulation Withstand: 825kV (110%) for 1min
Cooling System: ONAN (Oil Natural Air Natural)
Ultra-Low Partial Discharge Performance
Voltage Level | Maximum PD | Industry Standard |
---|---|---|
600kV (80% Un) | ≤3pC | 5-8pC |
750kV (100% Un) | ≤5pC | 10-15pC |
PD levels verified per IEC 60270 with calibrated measurement system
Advanced Engineering Design
Dual-Stage Architecture
2×375kV modular units
Field-configurable series connection
Individual unit testing capability
N2-inerted oil preservation
Transport Optimization
Quick-release aluminum corona rings
Disassemblable HV arms
Compact shipping configuration
Seismic-rated removable pedestal
Precision Measurement System
Configuration Options
Single-Stage: 0-375kV measurement
Dual-Stage Series: 0-750kV operation
3000:1 high-sensitivity output
Connection System
Corona-free HV terminals (RIV <20dB)
Variable frequency power source integration
Low-inductance measuring leads (≤3nH/m)
Scalable connectors for GIS/transformer interfaces
Safety & Compliance
Dielectric Integrity
Zero discharge at 825kV withstand test
Automatic PD cutoff at >5pC
Real-time oil quality monitoring
International Standards
IEC 60060-1: High-voltage testing
IEC 60270: Partial discharge measurement
IEEE 4: Measurement standards
IEC 60358: Coupling capacitors
Industry Applications
Power Transmission
750kV+ substation monitoring
Transformer impulse testing
Gas-insulated switchgear diagnostics
Grid Communication
EHV power line carrier systems
HVDC filter bank monitoring
Smart grid sensor calibration
Operational Guidelines
Pre-test insulation verification (>10GΩ)
Dual-grounding confirmation (IEC 61936)
ONAN cooling activation 30 min pre-operation
Continuous PD monitoring during tests
Annual dielectric strength validation
Safety Notice: Requires Class E4 PPE per IEC 61482. Minimum clearance: 7.5 meters for 750kV operations.