600kV ~ 800kV Range
LQHVF 720kV/500pF Capacitive Voltage Divider & Coupling Capacitor
Engineered for the most demanding high-voltage applications, the LQHVF 720kV/500pF system delivers unprecedented partial discharge performance across voltage ranges. With industry-leading PD levels as low as 2pC at 288kV and a precision 3000:1 ratio, this dual-function solution enables laboratory-grade measurement and communication in substation and testing environments.
Technical Specifications
Electrical Parameters
Rated Voltage: 720kV AC
Capacitance: 500pF ±5%
Frequency: 50Hz
Dividing Ratio: 3000:1 nominal
Performance Metrics
Accuracy: ≤±1% full scale
Dielectric Loss: <0.2% @ 20°C
Insulation Withstand: 792kV (110%) for 1min
Cooling System: ONAN (Oil Natural Air Natural)
Industry-Leading Partial Discharge Performance
Voltage Level | Maximum PD | Industry Standard |
---|---|---|
288kV (40% Un) | <2pC | 5-10pC |
360kV (50% Un) | <5pC | 10-15pC |
576kV (80% Un) | <4pC | 8-12pC |
720kV (100% Un) | <10pC | 15-20pC |
Advanced Engineering Design
Transport-Optimized System
Quick-release aluminum corona rings
Modular HV arm disassembly
N2-inerted oil preservation (O₂ <0.5%)
Compact shipping configuration
Precision Measurement System
3000:1 high-sensitivity ratio
Low-noise output (SNR >65dB)
Temperature-compensated electronics
Versatile Connection System
Measurement Configurations
Single-stage operation (0-360kV)
Two-stage series connection (0-720kV)
Corona-free HV terminals (RIV <22dB)
Signal Integration
Variable frequency power source compatibility
Low-inductance measuring leads (≤3nH/m)
Scalable connectors for GIS/bushing interfaces
Safety & Compliance
Structural Integrity
Removable seismic-rated pedestal
Interlocking stability mechanism
Zero discharge at 792kV withstand
International Standards
IEC 60060-1: High-voltage testing
IEC 60270: Partial discharge measurement
IEEE 4: Measurement standards
IEC 60358: Coupling capacitors
Industry Applications
Power Transmission
EHV transformer PD diagnostics
Busbar insulation monitoring
Circuit breaker testing
Grid Communication
Substation PLC systems
HVDC filter monitoring
Smart grid sensor networks
Operational Guidelines
Pre-test insulation verification (>10GΩ)
Dual-grounding confirmation (IEC 61936)
ONAN cooling activation 30 min pre-operation
Continuous PD monitoring during tests
Annual dielectric strength validation
Safety Notice: Requires Class E4 PPE per IEC 61482. Minimum clearance: 7 meters for 720kV operations.