600kV ~ 800kV Range
LQHVF 700kV/4000pF Coupling Capacitor & Capacitive Voltage Divider
Engineered for precision in extra-high-voltage systems, the LQHVF 700kV/4000pF unit delivers laboratory-grade measurement capabilities in field conditions. Combining ultra-low partial discharge performance with exceptional dielectric stability, this dual-function solution enables accurate voltage measurement and power line communication in demanding substation and testing environments.
Technical Specifications
Electrical Parameters
Rated Voltage: 700kV AC
Capacitance: 4000pF ±3%
Frequency: 50Hz (60Hz optional)
Dividing Ratio: 2000:1 nominal
Performance Metrics
Accuracy: ≤±1% full scale
Dielectric Loss: <0.2%
Partial Discharge:
<5pC at 700kV
<2pC at 500kV
Insulation Withstand: 770kV (110%) for 1min
Advanced Engineering Design
Transport-Optimized Components
Quick-release aluminum corona rings
Modular HV arm disassembly
Compact shipping configuration
N2-inerted oil preservation (O₂ <0.5%)
Thermal Management
ONAN cooling (Oil Natural Air Natural)
Temperature stability: ±2°C at full load
Built-in oil quality sensors
Precision Measurement System
Configuration | Voltage Range | PD Performance |
---|---|---|
Single-Stage | 0-350kV | <2pC typical |
Two-Stage Series | 0-700kV | <5pC certified |
Connection System
Corona-free HV terminals (RIV <25dB)
Variable frequency source compatibility
Scalable connectors for GIS/transformer interfaces
Low-inductance measuring leads (≤5nH/m)
Stability & Safety Systems
Pedestal Design
Removable seismic-rated base (IEC 60068-3 Class 2)
Ground-level measurement terminals
Interlocking stability feet
Dielectric Protection
Zero discharge at 770kV withstand test
Real-time PD monitoring system
Automatic de-energization on anomaly detection
Certifications & Industry Applications
International Standards
IEC 60060-1: High-voltage testing
IEC 60270: Partial discharge measurement
IEEE 4: Measurement standards
IEC 60358: Coupling capacitors
Critical Applications
EHV transformer diagnostic testing
Substation power line carrier communication
Cable partial discharge mapping
Smart grid sensor calibration
Operational Guidelines
Pre-test insulation resistance verification (>10GΩ)
Dual-grounding confirmation (IEC 61936)
Cooling system activation 30 minutes pre-energization
Continuous PD monitoring during operation
Annual dielectric strength validation
Safety Notice: Requires Class E4 PPE per IEC 61482. Minimum clearance distance: 6 meters.