Primary Switchgear Cabinet
LQPGL 0.415kV/400A Primary Switchgear Cabinet
Advanced power distribution solution featuring 16kA short-circuit withstand capacity, precision metering, and remote control capabilities for demanding industrial environments.
Technical Specifications
Parameter | Specification |
---|---|
Rated Voltage | 0.415kV |
Rated Current | 400A |
Frequency | 50Hz |
Short-Time Withstand Current | 16kA |
Control Voltage | AC220V |
Protection Rating | IP20 (IEC 60529) |
Installation | Indoor, Shielded Enclosure |
Core Protection & Control Components
Current Transformer (CT)
Accurate load monitoring and over-current protection
Voltage Transformer (PT)
Precise voltage measurement for protection relays
Isolation Switch
Visible disconnection for maintenance safety
AC Contactor
Remote-controlled circuit switching
Protection Relays
Current/voltage/intermediate relay coordination
Control Interface
Meters, buttons, and indicator lamps for operation
Primary Functions
Circuit Isolation - Physical disconnection capability
Remote Operation - AC220V controlled switching
Over-Voltage Protection - Adjustable voltage relay settings
Over-Current Protection - Instantaneous and timed tripping
Measurement & Indication - Real-time electrical parameter monitoring
Ground Fault Protection - Integrated ground switch
Key Performance Features
High Fault Tolerance
16kA short-circuit current rating for system stability
EMI Protection
Shielded enclosure prevents electromagnetic interference
Precision Instrumentation
Class 1.0 CTs and 0.5% accuracy PTs
Safety-First Design
Mechanical interlocks prevent unsafe operations
Industrial Applications
Steel plant main distribution boards
Industrial process control centers
Large pump station power control
Manufacturing plant transformer secondaries
High-capacity compressor power management
Design & Safety Standards
IEC 61439-1/2: Low-voltage switchgear assemblies
IEC 62271-200: Metal-enclosed switchgear
IEC 61869: Instrument transformer standards
IEC 60255: Protection relay requirements
Clearance/Creepage: 25mm/kV (per IEC 60664)
Partial discharge: < 5pC at 1.1Ur
Installation & Commissioning
Site Requirements
Concrete foundation: Min. 150mm thickness
Clearances: 800mm front, 300mm sides/rear
Ambient temperature: -5°C to +45°C
Relative humidity: < 90% non-condensing
Commissioning Tests
Primary injection testing at 100% rated current
Dielectric strength test at 3kV AC for 1 min
Relay calibration and trip timing verification
Contactor operation cycle test (10 operations)
Maintenance Protocol
Interval | Action |
---|---|
Monthly | Visual inspection of indicators and meters |
Quarterly | Thermographic scan of connections |
Biannual | Insulation resistance measurement (5kV megger) |
Annual | Relay calibration and contact inspection |
5 Years | Full primary injection and timing test |