High Voltage Test Solutions
Persistently developing technology, improving quality, management, and service standards

200kV ~ 400kV Range

300kV/500pF Dual-Function Capacitor | IEC & GB-Compliant Precision Instrument

300kV/500pF dual-function capacitor compliant with IEC 358, GB50150, and DL/T standards. Features ≤±1% accuracy, <0.2% dielectric loss, and <10pC PD for precision power equipment testing.


  • US$ 6,384.00
  • Lead time: 30days

>>>WhatsApp Communication<<<

Product Details

Product Tags

LQHVF 300kV/500pF Dual-Function Capacitor: Standards-Compliant Precision Solution

Certified Instrument for Power Equipment Testing

The LQHVF 300kV/500pF meets stringent international and Chinese standards including IEC 358, GB50150, and DL/T specifications. Engineered for power equipment commissioning and maintenance, this dual-function solution provides:

  • Full compliance with hand-over test requirements (GB50150-2006)

  • Precision measurement for resonance testing (DL/T 849.6-2004)

  • Preventive test capability per DL/T596-1996

  • Dual functionality as voltage divider and coupling capacitor

Industry-Leading Stability

Temperature coefficient of 5×10⁻⁵ %/°C ensures consistent performance across environmental variations per IEC 358 requirements.

Technical Specifications

ParameterSpecificationStandard Compliance
Rated Voltage300kVIEC 358 Clause 4.1
Nominal Capacitance500pFDL/T 849.6-2004
Voltage Ratio1000:1GB50150-2006 Annex B
Accuracy≤±1%Class 0.5 per IEC 60060-2
Dielectric Loss<0.2% @20°CDL/T596-1996 Clause 9
Partial Discharge<10pC @300kVIEC 60270
Operating Time60 minutes @300kVGB50150-2006 Clause 7.3

Insulation Levels

HV Arm

330kV/1min

110% rated voltage

LV Arm

3kV/1min

IEC 358 Clause 5.3

Compliance with Industry Standards

GB50150-2006

Hand-over Test of Electric Equipment Installation Engineering

  • Sec 10.3: HV test requirements

  • Annex B: Measurement accuracy

  • Clause 7.3: Test duration

DL/T 849.6-2004

High-voltage Resonance Test Unit Specifications

  • Sec 5.2: Capacitance requirements

  • Annex A: Partial discharge limits

  • Clause 6.3: Temperature stability

DL/T596-1996

Preventive Test Code for Electric Power Equipment

  • Clause 9: Dielectric loss requirements

  • Sec 11.4: Insulation test procedures

  • Annex C: Test equipment specifications

IEC 358 (1990)

Coupling Capacitors and Capacitor Dividers

  • Clause 4.1: Rated voltage

  • Sec 5.3: Insulation levels

  • Clause 8.2: Temperature coefficient

Dual-Function Operation

As Precision Voltage Divider

Compliant with GB50150 hand-over test requirements for:

  • Transformer commissioning tests

  • Cable withstand voltage verification

  • GIS insulation integrity testing

As Coupling Capacitor

IEC 358-compliant signal coupling for:

  • Protection relay communication

  • Power line carrier (PLC) systems

  • SCADA data transmission

Design Features for Standardized Testing

Oil-Immersed Construction

Meets IEC 358 Clause 6.1 for dielectric fluid insulation and thermal stability.

Removable Component System

DL/T596-compliant design for field maintenance and calibration.

Dual Insulation System

Separate HV (330kV) and LV (3kV) insulation meets GB50150 Annex B requirements.

Testing Protocol Compliance

Preventive Maintenance Testing (DL/T596)

  1. Measure capacitance and tanδ at 20°C

  2. Perform 3kV/1min test on LV arm

  3. Verify PD level

    <10pc 80="" at="">
  4. Record temperature coefficient validation

Commissioning Tests (GB50150)

  1. 330kV/1min withstand test on HV arm

  2. Accuracy verification at multiple voltage points

  3. 60-minute continuous operation test

  4. Dielectric loss measurement at 20°C

Operational Benefits

  • Regulatory Compliance: Meets all Chinese and international testing standards

  • Certification Ready: Includes standard-compliant test reports

  • Thermal Stability: 5×10⁻⁵ %/°C coefficient ensures consistent results

  • Dual-Function Efficiency: Single instrument for measurement and communication

"The comprehensive standards compliance eliminated certification delays - we passed GB50150 hand-over tests 30% faster than with conventional equipment."
               - Chief Engineer, Power Grid Construction Project

Installation & Certification Protocol

  1. Documentation Review: Verify standard-compliant test certificates

  2. Site Assembly: Install removable components per DL/T849.6

  3. Insulation Verification:

    • HV arm: 330kV/1min test per GB50150

    • LV arm: 3kV/1min test per IEC 358

  4. Performance Validation:

    • Dielectric loss measurement at 20°C

    • Accuracy verification at 50%, 80%, 100% Un

    • PD test at 300kV and 240kV

  5. Continuous Operation Test: 60-minute run at 300kV

  6. Certification: Issue GB50150-compliant hand-over report

Certification & Documentation

Each unit includes standard-compliant test reports:

  • GB50150-2006 Annex B test certificate

  • IEC 358 Clause 8 compliance report

  • DL/T596-1996 preventive test record

  • Temperature coefficient validation data

Third-party certified by CEPRI (China Electric Power Research Institute).

>>>WhatsApp Communication<<<

>>>Click To Get Quote<<<

Leave Your Message

Leave Your Message