High Voltage Test Solutions
Persistently developing technology, improving quality, management, and service standards

>400kV Range

LQTT 1000kV/200kVA High Voltage Test Transformer | IEC-Compliant AC Dielectric Tester

200kVA single-phase AC test transformer system for 1000kV dielectric strength tests. Features 2000:1 measurement winding, <5pC partial discharge, and IEC safety compliance. Ideal for utility-scale insulation testing.


>>>WhatsApp Communication<<<

Product Details

Product Tags

Core Technical Specifications

1. Main Transformer (Upper Stage)

ParameterValueStandard
ModelLQTT 1000kV/200kVACylinder type
Rated VoltageHV Winding: 1000kV
Excitation: 2×0.6kV
IEC 60060-1
Rated CurrentHV: 0.2A
Excitation: 2×166.7A
-
Waveform Distortion≤3%IEEE 432
Partial Discharge (PD)<5pC @ 1000kV
<3pC @ 800kV
IEC 60270
Impedance Voltage≤15%-

2. Cascaded Transformers

(a) Upper Stage: HCTT 100kVA/500kV

  • Dimensions: Ø1290/1410×3560mm

  • Weight: 7,000 kg

  • Overload Capacity: 150% current for 300s

(b) Lower Stage: HCTT 200kVA/500kV

  • Measurement Ratio: 1000:1

  • Insulation: Fixed cylinder design


Critical Safety & Performance Features

  • Grounding Protection:
    HV terminal earthed via 5/5A CT for real-time current monitoring & operator safety.

  • Thermal Resilience:

    • Continuous operation @ 80% load (ΔT winding <65K, oil <55K)

    • 110% overvoltage (1100kV/60s) without insulation failure

  • Environmental Compliance:

    • Noise: ≤60dB (measured at 4m)

    • Oil Maintenance: Injection/release valves standard


Certifications & Standards

- **Dielectric Safety:** IEC 61010-1 Cat IV  
- **Test Accuracy:** ±0.5% (calibrated per IEC 62586-2)  
- **Partial Discharge:** IEC 60270 Class II  
- **Environmental:** IP67 (substation-grade ingress protection)

Application Scenarios (Keyword-Rich)

  • Energy Sector:

    • Insulation integrity tests for 500kV+ substations

    • Transformer acceptance testing (per ANSI/NETA ATS)

  • Manufacturing:

    • Dielectric strength validation of GIS components

  • Renewables:

    • Cable fault location in offshore wind farms


FAQ Section (Optimized for Featured Snippets)

Q: What’s the calibration interval for this HV test system?
*A: Annual traceable calibration required (IEC 62586-2), with quarterly field verification.*

Q: Can it test HVDC equipment?
A: No – dedicated DC test sets are needed for capacitor banks/HVDC applications.

Q: Maximum continuous operating time at full load?
*A: 60 minutes @ 1000kV/0.2A (ambient start temp ≤40°C).*


>>>WhatsApp Communication<<<

>>>Click To Get Quote<<<

Leave Your Message

Leave Your Message