Gas Insulated Divider
800KV/30pF SF6 Capacitor Voltage Divider
This ultra-high voltage measurement device delivers unprecedented wide-band performance for 800KV-class transmission systems, combining 4000:1 high-ratio measurement with extended 180-minute operation capability.
Technical Specifications
Parameter | Specification | Technical Significance |
---|---|---|
Rated Voltage | 800KV | Designed for 765KV systems with 4.6% margin |
Frequency Range | 30-300Hz | From sub-harmonic to 6th harmonic analysis |
Voltage Ratio | 4000:1 | 200V output at rated voltage |
Capacitance | 30pF | Ultra-low loading (0.075mA at 800KV) |
Accuracy | ≤±1% | Class 1 measurement precision |
Dielectric Loss | <0.5% | Excellent insulation efficiency |
Duty Cycle | 180min ON/60min OFF | Extended continuous operation |
Breakthrough Features
Wide-Frequency Technology
30Hz for sub-synchronous resonance studies
50/60Hz fundamental power measurements
Up to 300Hz (6th harmonic) analysis
Flat frequency response (±0.2dB)
Thermal Management System
Optimized gas flow design
Distributed temperature sensors
180-minute continuous rating
60-minute cooldown period
Typical Applications
UHV Transmission
765KV line voltage monitoring
Power quality analysis
Research Facilities
Sub-synchronous oscillation studies
Harmonics measurement up to 300Hz
Converter Stations
HVDC valve-side measurements
Characteristic harmonic analysis
Installation Requirements
Climate-controlled environment (±2°C)
Maintain SF6 pressure at 0.70±0.02MPa (20°C)
Use low-noise triaxial cables (min 12mm diameter)
Grounding resistance <0.5Ω (measured at DC)
Minimum clearances:
7m to grounded objects
10m to other HV equipment
Maintenance Protocol
Interval | Procedure | Acceptance Criteria |
---|---|---|
Pre-operation | Gas purity test | SF6 ≥99.95% |
Daily | Pressure verification | 0.68-0.72MPa |
Weekly | Frequency response test | 30-300Hz ±0.2dB |
Monthly | Ratio accuracy check | 4000:1 ±0.5% |
Compliance Standards
IEC 60060-1:2010 (High-voltage test techniques)
IEEE Std 4-2013 (Standard for HV testing)
IEC 61869-11:2018 (Instrument transformers)
GB/T 16927.1-2011 (Chinese HV test standards)
Critical Requirement: Requires ≥50MΩ input impedance measuring instruments due to 30pF capacitance. Strictly observe 60-minute cooldown after 180-minute operation.