Gas Insulated Divider
750KV/30pF SF6 Capacitor Voltage Divider
This state-of-the-art ultra-high voltage measurement device delivers unprecedented ≤2pC partial discharge performance with dual-frequency capability, designed for 800KV-class transmission systems and advanced research applications.
Technical Specifications
Parameter | Specification | Technical Advantage |
---|---|---|
Rated Voltage | 750KV | 800KV systems with 6.25% safety margin |
Rated Capacity | 30pF | Ultra-low circuit loading (0.07mA at 750KV) |
Frequency | 50Hz/200Hz | Power frequency + 4th harmonic measurement |
Dividing Ratio | 2000:1 | 375V output at rated voltage |
Accuracy | ≤±1% | Class 1 measurement precision |
Partial Discharge | ≤2pC @750KV ≤1pC @550KV | Best-in-class PD performance |
Dielectric Loss | <0.3% | Superior insulation efficiency |
Temp Coefficient | <0.0005 | Stable across -50°C to +90°C |
Overvoltage | 800KV for 60s | 106.7% rated voltage withstand |
Operation Time | 60 minutes continuous | Extended duration testing |
Innovative Design Features
Dual-Frequency Operation
50Hz for fundamental power measurements
200Hz for 4th harmonic analysis
Precision-engineered frequency response
PD Suppression Technology
Five-stage graded shielding
Ultra-smooth surfaces (Ra<0.2μm)
Active SF6 gas conditioning system
Integrated Faraday cage
Typical Applications
UHV Transmission
800KV line voltage monitoring
Grid synchronization measurements
Research Facilities
Reference standard for calibrations
Harmonics analysis up to 200Hz
GIS Diagnostics
Partial discharge mapping
Insulation condition monitoring
Installation Requirements
Climate-controlled environment (±3°C stability)
Maintain SF6 pressure at 0.65±0.02MPa (at 20°C)
Use quad-shielded coaxial cables (min 15mm diameter)
Grounding resistance <0.5Ω (measured at DC)
Minimum clearances:
5m to grounded objects
8m to other HV equipment
Maintenance Protocol
Interval | Procedure | Acceptance Criteria |
---|---|---|
Pre-use | Gas purity test | SF6 ≥99.9% |
Daily | Pressure verification | 0.63-0.67MPa |
Weekly | Surface inspection | No particulate contamination |
Monthly | PD verification | ≤2pC @750KV |
Compliance Standards
IEC 60060-1:2010 (High-voltage test techniques)
IEC 60270:2015 (Partial discharge measurements)
IEEE Std 4-2013 (Standard for HV testing)
GB/T 16927.1-2011 (Chinese HV test standards)
Critical Requirement: Requires minimum 20MΩ input impedance measuring instruments due to 30pF capacitance. For ≤1pC measurements at 550KV, must use fully shielded test enclosure.