High Voltage Test Solutions
Persistently developing technology, improving quality, management, and service standards

Gas Insulated Divider

750KV/30pF SF6 Ultra-HV Divider with ≤2pC PD | Dual-Frequency Precision Measurement

Premium 750KV/30pF SF6 gas-insulated voltage divider featuring ≤2pC partial discharge, dual-frequency (50/200Hz) operation, and 60-minute continuous rating for ultra-high voltage applications.


  • US$1.00; Negotiated Price
  • Lead time: 120days

>>>WhatsApp Communication<<<

Product Details

Product Tags

750KV/30pF SF6 Capacitor Voltage Divider

This state-of-the-art ultra-high voltage measurement device delivers unprecedented ≤2pC partial discharge performance with dual-frequency capability, designed for 800KV-class transmission systems and advanced research applications.

Technical Specifications

ParameterSpecificationTechnical Advantage
Rated Voltage750KV800KV systems with 6.25% safety margin
Rated Capacity30pFUltra-low circuit loading (0.07mA at 750KV)
Frequency50Hz/200HzPower frequency + 4th harmonic measurement
Dividing Ratio2000:1375V output at rated voltage
Accuracy≤±1%Class 1 measurement precision
Partial Discharge≤2pC @750KV
≤1pC @550KV
Best-in-class PD performance
Dielectric Loss<0.3%Superior insulation efficiency
Temp Coefficient<0.0005Stable across -50°C to +90°C
Overvoltage800KV for 60s106.7% rated voltage withstand
Operation Time60 minutes continuousExtended duration testing

Innovative Design Features

Dual-Frequency Operation

  • 50Hz for fundamental power measurements

  • 200Hz for 4th harmonic analysis

  • Precision-engineered frequency response

PD Suppression Technology

  • Five-stage graded shielding

  • Ultra-smooth surfaces (Ra<0.2μm)

  • Active SF6 gas conditioning system

  • Integrated Faraday cage

Typical Applications

UHV Transmission

  • 800KV line voltage monitoring

  • Grid synchronization measurements

Research Facilities

  • Reference standard for calibrations

  • Harmonics analysis up to 200Hz

GIS Diagnostics

  • Partial discharge mapping

  • Insulation condition monitoring

Installation Requirements

  1. Climate-controlled environment (±3°C stability)

  2. Maintain SF6 pressure at 0.65±0.02MPa (at 20°C)

  3. Use quad-shielded coaxial cables (min 15mm diameter)

  4. Grounding resistance <0.5Ω (measured at DC)

  5. Minimum clearances:

    • 5m to grounded objects

    • 8m to other HV equipment

Maintenance Protocol

IntervalProcedureAcceptance Criteria
Pre-useGas purity testSF6 ≥99.9%
DailyPressure verification0.63-0.67MPa
WeeklySurface inspectionNo particulate contamination
MonthlyPD verification≤2pC @750KV

Compliance Standards

  • IEC 60060-1:2010 (High-voltage test techniques)

  • IEC 60270:2015 (Partial discharge measurements)

  • IEEE Std 4-2013 (Standard for HV testing)

  • GB/T 16927.1-2011 (Chinese HV test standards)

Critical Requirement: Requires minimum 20MΩ input impedance measuring instruments due to 30pF capacitance. For ≤1pC measurements at 550KV, must use fully shielded test enclosure.

>>>WhatsApp Communication<<<

>>>Click To Get Quote<<<

Leave Your Message

Leave Your Message