Gas Insulated Divider
600KV/1000pF SF6 Capacitor Voltage Divider
This ultra-high voltage measurement device sets new standards in partial discharge performance and measurement stability, designed for critical applications in 550KV-class transmission systems and high-voltage laboratories.
Technical Specifications
Parameter | Specification | Performance Advantage |
---|---|---|
Rated Voltage | 600KV | 550KV systems with 9% safety margin |
Rated Capacity | 1000pF | Optimal balance between sensitivity and loading |
Frequency | 50Hz | Standard power frequency measurement |
Dividing Ratio | 2000:1 | High-ratio measurement for EHV systems |
Accuracy | ≤±1% | Class 1 measurement precision |
Partial Discharge | ≤2pC @600KV | Industry-leading PD performance |
Dielectric Loss | <0.3% | Exceptional insulation efficiency |
Temp Coefficient | <0.0005 | Stable across -40°C to +85°C |
Overvoltage | 660KV for 60s | 110% rated voltage withstand |
Operation Time | 30 minutes continuous | Extended testing capability |
Breakthrough Design Features
Ultra-Low Partial Discharge
Special graded-ring electrode design
Electropolished surfaces (Ra<0.4μm)
Active SF6 gas monitoring system
Integrated shielding against external interference
High-Capacity Performance
1000pF capacitance provides strong signal output
Reduced susceptibility to electromagnetic noise
Compatible with standard measuring instruments
Optimized for long-distance cable runs
Typical Applications
EHV Transmission
550KV line voltage monitoring
Substation automation systems
High Voltage Labs
Reference standard for calibrations
Ultra-low PD testing
GIS Monitoring
Gas-insulated switchgear diagnostics
Partial discharge localization
Installation Requirements
Controlled environment (max 5°C/hour temperature change)
Maintain SF6 pressure at 0.60±0.03MPa (at 20°C)
Use double-shielded coaxial cables (min 12mm diameter)
Grounding system resistance <1Ω (measured at DC)
Minimum clearances:
4m to grounded objects
7m to other HV equipment
Maintenance Schedule
Interval | Procedure | Acceptance Criteria |
---|---|---|
Daily | Gas density check | 0.57-0.63MPa |
Weekly | Surface inspection | No visible contamination |
Monthly | Partial discharge test | ≤2pC @600KV |
Annually | Full calibration | Ratio error ≤±0.8% |
Compliance Standards
IEC 60060-1:2010 (High-voltage test techniques)
IEC 60270:2015 (Partial discharge measurements)
IEEE Std 4-2013 (Standard for HV testing)
GB/T 16927.1-2011 (Chinese HV test standards)
Critical Requirement: The 1000pF capacitance requires measuring instruments with input impedance ≥5MΩ to maintain specified accuracy. Never exceed 30 minutes continuous operation at rated voltage.