High Voltage Test Solutions
Persistently developing technology, improving quality, management, and service standards

Gas Insulated Divider

600KV/1000pF SF6 Capacitor Voltage Divider with ≤2pC Partial Discharge | Ultra-HV Measurement Device

Precision 600KV/1000pF SF6 gas-insulated voltage divider featuring industry-leading ≤2pC partial discharge, ±1% accuracy, and 30-minute continuous operation for extra-high voltage applications.


  • US$1.00; Negotiated Price
  • Lead time: 120days

>>>WhatsApp Communication<<<

Product Details

Product Tags

600KV/1000pF SF6 Capacitor Voltage Divider

This ultra-high voltage measurement device sets new standards in partial discharge performance and measurement stability, designed for critical applications in 550KV-class transmission systems and high-voltage laboratories.

Technical Specifications

ParameterSpecificationPerformance Advantage
Rated Voltage600KV550KV systems with 9% safety margin
Rated Capacity1000pFOptimal balance between sensitivity and loading
Frequency50HzStandard power frequency measurement
Dividing Ratio2000:1High-ratio measurement for EHV systems
Accuracy≤±1%Class 1 measurement precision
Partial Discharge≤2pC @600KVIndustry-leading PD performance
Dielectric Loss<0.3%Exceptional insulation efficiency
Temp Coefficient<0.0005Stable across -40°C to +85°C
Overvoltage660KV for 60s110% rated voltage withstand
Operation Time30 minutes continuousExtended testing capability

Breakthrough Design Features

Ultra-Low Partial Discharge

  • Special graded-ring electrode design

  • Electropolished surfaces (Ra<0.4μm)

  • Active SF6 gas monitoring system

  • Integrated shielding against external interference

High-Capacity Performance

  • 1000pF capacitance provides strong signal output

  • Reduced susceptibility to electromagnetic noise

  • Compatible with standard measuring instruments

  • Optimized for long-distance cable runs

Typical Applications

EHV Transmission

  • 550KV line voltage monitoring

  • Substation automation systems

High Voltage Labs

  • Reference standard for calibrations

  • Ultra-low PD testing

GIS Monitoring

  • Gas-insulated switchgear diagnostics

  • Partial discharge localization

Installation Requirements

  1. Controlled environment (max 5°C/hour temperature change)

  2. Maintain SF6 pressure at 0.60±0.03MPa (at 20°C)

  3. Use double-shielded coaxial cables (min 12mm diameter)

  4. Grounding system resistance <1Ω (measured at DC)

  5. Minimum clearances:

    • 4m to grounded objects

    • 7m to other HV equipment

Maintenance Schedule

IntervalProcedureAcceptance Criteria
DailyGas density check0.57-0.63MPa
WeeklySurface inspectionNo visible contamination
MonthlyPartial discharge test≤2pC @600KV
AnnuallyFull calibrationRatio error ≤±0.8%

Compliance Standards

  • IEC 60060-1:2010 (High-voltage test techniques)

  • IEC 60270:2015 (Partial discharge measurements)

  • IEEE Std 4-2013 (Standard for HV testing)

  • GB/T 16927.1-2011 (Chinese HV test standards)

Critical Requirement: The 1000pF capacitance requires measuring instruments with input impedance ≥5MΩ to maintain specified accuracy. Never exceed 30 minutes continuous operation at rated voltage.

>>>WhatsApp Communication<<<

>>>Click To Get Quote<<<

Leave Your Message

Leave Your Message