<150kV Range
LQHDR Series: 70kV/5kΩ/0.07A Precision Damping Resistor
Laboratory-Grade Performance for Critical Measurements
Engineered for precision high-voltage applications, the LQHDR 70kV/5kΩ/0.07A damping resistor delivers ultra-low partial discharge (LT 3pC) performance essential for transformer testing, dielectric analysis, and calibration systems. With optimized thermal management and IEC-compliant construction, it ensures measurement integrity at 70kV levels.
Technical Specifications
Parameter | Specification | Standard |
---|---|---|
Model | LQHDR | IEC 60270:2015 |
Rated Voltage | 70kV AC | |
Nominal Resistance | 5kΩ ±0.5% | |
Rated Current | 0.07A | |
Power Rating | 4.9kW (calculated from V×I) | |
Partial Discharge (PD) | <3pC @ 70kV | |
Frequency Rating | 50Hz |
Operational Performance
⏱️ Duty Cycle
Full load operation: 60 minutes continuous @ 70kV/0.07A
Sustained operation: Continuous @ 80% rated voltage/current (56kV/0.056A)
🔥 Thermal Management
Max. temperature rise: ≤80K @ 100% load (resistor body)
Thermal recovery: 30-minute cooldown between full-load cycles
Precision Advantage: The industry-leading LT 3pC PD level ensures minimal measurement noise during sensitive tests like transformer partial discharge analysis per IEC 60270 standards.
Critical Applications
🔬 High-Voltage Calibration
Reference component for calibrating 70kV measurement systems with NIST-traceable accuracy.
⚡ Transformer PD Testing
Ensures LT 3pC background noise during critical partial discharge measurements on power transformers.
🧪 Dielectric Research
Provides stable damping for material breakdown testing at 70kV with minimal interference.
Precision Design Features
Low-inductance winding: Air-core design with LT 0.1μH residual inductance
Triple-shielded enclosure: Electromagnetic interference suppression for PD measurements
Precision resistance elements: Military-grade wire with ±0.5% tolerance
Corona-free terminals: Silicone-insulated connectors rated for 100kV BIL
Thermal monitoring port: Integrated PT100 sensor interface
Safety & Handling Protocol
Maintain minimum 0.7m clearance (10mm/kV rule)
Verify ground connection LT 0.1Ω before energizing
Use IR thermometer to monitor surface temperature (max 80°C)
Allow 30-minute cooldown between full-load tests
Safety Compliance: Meets IEC 61010-1 safety requirements for laboratory equipment.
Maintenance & Calibration
Quarterly resistance verification (±0.5% tolerance)
Annual PD performance validation per IEC 60270
Biannual dielectric test: >5000MΩ @ 10kV DC
5-year recalibration with NIST-traceable certification