<100kV Range
LQHVF 50kV/300pF Capacitive Voltage Divider & Coupling Capacitor
Ultra-HV Precision: Industry-leading<3pc partial="" discharge="" detection="" at="" 50kv="" with="">
Engineered for Extreme Voltage Applications
Designed for critical 50kV systems, the LQHVF combines laboratory-grade precision with field-deployable reliability. The optimized 300pF capacitance enables:
Ultra-sensitive partial discharge detection (<3pC)
Accurate voltage measurement with ≤±1% accuracy
Extended frequency response (DC to 100kHz)
Minimal circuit loading during measurements
50kV
Technical Specifications
Parameter | Specification | Performance Advantage |
---|---|---|
Rated Voltage | 50kV | Ultra-high voltage capability |
Capacitance | 300pF | Optimal balance for measurement & PD coupling |
Voltage Ratio | 1000:1 | 50V output at 50kV input |
Partial Discharge | <3pC @ 50kV | Exceeds IEC 60270 Class I requirements |
Dielectric Loss | <0.5% | Superior insulation efficiency |
Accuracy | ≤±1% | Meets IEEE 4-2013 Class 0.5 standards |
Operating Time | 60min @ 50kV | Full-power diagnostic capability |
Cooling System | ONAN | Natural oil/air convection |
Advanced Modular Design
Corona Rings
Aluminum alloy
Removable design
HV Arm
50kV rated
Quick-disconnect
Ly Arm
Measurement interface
BNC output
Removable Base
Stabilized platform
Leveling feet
Oil-Immersed Construction
High-grade mineral oil with dielectric strength >65kV/mm
Field Benefit: Enhanced arc suppression and thermal stability
Quick-Disconnect System
Tool-free assembly in under 10 minutes
Maintenance Advantage: Component-level servicing
Dual-Function Capabilities
Technical Advantage: 300pF capacitance provides optimal impedance matching for PD detection at 50kV
Voltage Division
Range: 0-50kV
Accuracy: ≤±1% from DC to 50kHz
Phase Error: <0.1° at 50Hz
PD Coupling
Sensitivity: <3pC at 50kV
Bandwidth: 20Hz-100kHz
Signal-to-Noise: 40% better than 1000pF models
Thermal Management System
ONAN Cooling: Oil Natural Air Natural convection maintains safe operating temperatures
Thermal Performance: <45°C rise during 60-min full-load operation
Operating Protocol:
60 minutes continuous at 50kV
Recommended 90-minute cooling period
Clearance Requirements: Maintain 30cm air space around unit
Compliance & Applications
Standards Compliance: IEC 60270:2000, IEEE 4-2013, EN 60060-1:2010
Critical Applications:
Testing of 50kV switchgear and GIS
Partial discharge monitoring in EHV transformers
High-voltage research laboratories
Power quality analysis in transmission systems
Dielectric testing of insulation materials
Operational Protocol
Assembly
Secure base to stable surface
Connect ly-arm to base
Install HV-arm assembly
Attach corona rings
Safety Measures
Ground base with ≥12mm² cable
Maintain 1.5m personnel clearance
Verify oil level before energization
Operation
Ramp voltage gradually (≤5kV/s)
Max 60 minutes at 50kV
Monitor temperature rise
Shutdown
De-energize system
Wait 10 minutes for discharge
Disassemble components
Pro Tip: For PD measurements at 50kV, use double-shielded coaxial cables with ferrite cores to minimize RF interference
Why This Instrument?
Extreme Voltage Precision
≤±1% accuracy at 50kV
Unmatched PD Sensitivity
<3pC detection capability
Field Deployable
Modular design for easy transport
Thermal Resilience
ONAN cooling for stable operation