<1000kV Range
LQHID 700KV-400pF Weak Damping Capacitor Voltage Divider
Dual-Stage High Voltage Design
Engineered for 700kV impulse testing, this voltage divider utilizes two series-connected 350kV/800pF capacitor stages with advanced weak damping technology:
Series-Connected Stages: 2×350kV/800pF units for 700kV operation
Multistage Damping: Precisely distributed resistors for clean waveform capture
Non-Inductive Architecture: Parallel low-voltage arm capacitors eliminate measurement distortion
Optimized Capacitance: 400pF total HV arm rating balances sensitivity and load
Mobile Test Platform
Heavy-Duty Construction
The reinforced metal base with polyurethane wheels provides both mobility and stability:
Industrial-Grade Frame: Supports 700kV mechanical stresses
Polyurethane Wheel System: 4-wheel design with fixed brace for test stability
Field-Assembled Electrode: Stainless steel top section for transport safety
Corona Control System
Optimized Corona Covers: Specially profiled for 0.7MV impulse waves
Stainless Steel Construction: Durable discharge protection
Modular Design: Top electrode installs on-site for transportation
Technical Specifications
Parameter | Specification |
---|---|
Rated Lightning Impulse | 700kV |
HV Arm Configuration | 2×350kV/800pF in series |
Total Capacitance | 400pF |
Response Time (Tas) | ≤150nS |
Over-Impulse (β) | ≤20% |
Scale Factor (Kg) | ≤±1% |
Voltage Ratio | 1000:1 |
Base Type | Mobile metal with polyurethane wheels |
Performance Features
High-Speed Measurement: ≤150ns response captures full lightning wave characteristics
Precision Scaling: 1000:1 ratio with ≤±1% uncertainty
Transport Optimized: 700kV capability in field-deployable package
Superior Corona Control: Specialized covers prevent 0.7MV flashovers
Standards Compliance
GB311: High-voltage test equipment requirements
IEC 60060-1: High-voltage test techniques
Full square wave response compliance
Typical Applications
Power Transmission
700kV transformer impulse tests
GIS system commissioning
Research & Development
High-voltage component validation
Dielectric material studies
Field Testing
Substation equipment verification
Lightning protection system tests
Operation & Maintenance
Assembly: Install top electrode per field manual before testing
Clearance: Maintain 4m minimum radius during 700kV tests
Inspection: Monthly check of polyurethane wheels and braces
Calibration: Quarterly verification of capacitance values
Storage: Keep corona covers in protective cases when disassembled