<1000kV Range
LQHID 600KV-400pF Weak Damping Capacitor Voltage Divider
Innovative Multistage Design
This advanced voltage divider features a series-connected multistage configuration with two 300kV/800pF capacitor stages, delivering superior performance for 600kV impulse testing. The non-inductive construction ensures accurate waveform measurement without distortion.
Dual-Stage HV Capacitors: 2×300kV/800pF units in series for 600kV operation
Multistage Damping Resistors: Precisely distributed for optimal transient response
Non-Inductive Low-Voltage Arm: Parallel-connected capacitors eliminate measurement artifacts
Mobile Test Platform
The rugged polyurethane wheel base with fixed brace provides exceptional mobility while maintaining stability during high-voltage tests:
Heavy-Duty Metal Frame: High mechanical strength base withstands 600kV forces
Polyurethane Wheels: Non-marking, high-durability movement system
Field-Installable Top Electrode: Stainless steel corona protection for transport safety
Flashover Prevention: Optimized electrode design minimizes abnormal discharges
Technical Specifications
Parameter | Specification |
---|---|
Rated Voltage | +600kV (Lightning Wave) |
HV Arm Configuration | 2×300kV/800pF in series |
Total Capacitance | 400pF |
Response Time (Ta) | ≤100nS |
Over-Impulse (β) | ≤20% |
Scale Factor Uncertainty (Ke) | ≤±1% |
Base Material | Reinforced metal with polyurethane wheels |
Corona Protection | Removable stainless steel top electrode |
Performance Advantages
Ultra-Fast Response: ≤100ns capture of lightning impulse transients
Exceptional Accuracy: ≤±1% measurement uncertainty
Transport-Optimized: Field-assembled top electrode simplifies logistics
Stable Platform: Fixed brace prevents movement during critical tests
Standards Compliance
Meets rigorous international and Chinese standards:
GB311: High-voltage test equipment requirements
IEC 60060-1: High-voltage test techniques
Square wave response fully compliant
Typical Applications
Transformer impulse withstand testing
GIS and switchgear commissioning
High-voltage laboratory research
Transient overvoltage studies
On-site power equipment verification
Operational Guidelines
Assemble top electrode according to field manual before testing
Verify all brace locks are engaged before energizing
Maintain 3.5m minimum clearance during 600kV tests
Inspect polyurethane wheels monthly for wear
Store electrodes in protective casing when disassembled