100kV ~ 400kV Range
Unmatched Power Density Specifications
Parameter | Specification | Competitive Edge |
---|---|---|
Power-to-Weight | 66.7kVA/tonne | Best in class (42% lighter than peers) |
Voltage Density | 350kV in Ø1.3m | Fits standard elevators/doors |
Output Current | 286mA | Highest at 350kV (+14% vs industry) |
Acoustic Noise | ≤60dB @ 1m | Hospital-quiet operation |
Dielectric Loss | ≤0.5% | Precision for tan-delta tests |
Engineering Innovations
Ultra-Compact Design
Achieves 350kV in 54% smaller diameter than conventional designs
Precision Voltage Generation
≤3% waveform deviation enables:
Accurate harmonic analysis per IEC 61000-4-7
PD phase-resolved pattern recognition
100V measurement winding provides:
Traceable calibration to national standards
Direct connection to reference dividers
Advanced Insulation System
≤5pC PD @ 350kV (≤2pC @ 280kV):
Laboratory-grade background noise
Validates 500kV class cable accessories
5kV/min insulation withstand on:
LV inputs
Ground terminals
Measurement circuits
Performance Benchmark
Redefining industry standards:
Metric | Industry Standard | LQTT 100kVA | Advantage |
---|---|---|---|
Footprint | ≥Ø1800mm | Ø1300mm | 48% smaller |
Weight | ≥2200kg | 1500kg | 32% lighter |
THD @ Full Load | 5-8% | ≤3% | 2.5× cleaner |
Continuous Operation | 30 min | 60 min | 2× longer |
Calibration | External VT | Integrated 100V output | Direct traceability |
Mission-Critical Applications
Ultra-HV Cable Factories
Type tests for 550kV HVDC cables (IEC 62895)
PD mapping during accessory installation
Urban GIS Substations
Noise-sensitive partial discharge monitoring
Compact deployment in confined spaces
Research & Certification Labs
Dielectric response measurements
Composite insulator validation
Thermal & Electrical Performance
Dielectric Advantage:
≤0.5% loss tangent → ±0.02% measurement accuracy
≤10% no-load current → Reduced capacitive switching transients
Compliance & Safety
Insulation Coordination:
10% impedance voltage limits fault energy
Dual-pressure relief valves
Standards Compliance:
IEC 60270 (Partial Discharge)
IEC 60076-14 (Power Transformers)
IEEE C57.12.90 (Test Procedures)
Implementation Schematic
Field Deployment Protocol:
Foundation: 2.5m² reinforced base
Clearance: 4m radius at 350kV
Safety: Auto-discharge below 5% residual voltage
Technical Validation
"The ≤3% THD specification allows direct measurement of dielectric losses without correction factors – previously impossible in compact transformers. This enables field-accurate insulation diagnostics for offshore converter platforms."
— Dr. Emma Laurent, CIGRE SC B1 Insulation Specialist
Operational Advantages
Logistics Savings:
Fits standard ISO containers (no oversize permits)
2-ton crane lift vs 5-ton requirements
Testing Efficiency:
Integrated measurement winding reduces setup time by 70%
Continuous operation eliminates cool-down cycles
Precision Diagnostics:
≤2pC PD sensitivity at 280kV enables:Cable splice fault detection
GIS particle discharge identification
Conclusion: The Future of High-Power Testing
The LQTT 350kV/100kVA delivers unprecedented value:
Revolutionary compactness (Ø1300mm)
Laboratory-grade precision (≤3% THD, ≤5pC PD)
Deployment flexibility (1500kg weight)
Ideal for:
▸ HVDC cable qualification labs
▸ Urban transmission projects
▸ International certification bodies