Gas Insulated Test Transformer
HGTS 800kV/800kVA SF6 Gas Insulated Test Transformer
Engineered for ultra-high voltage industrial applications, this 800kVA capacity transformer delivers 1A output current with dual-voltage flexibility and industry-leading ≤3pC partial discharge performance in a maintenance-free SF6 design.
Key Specifications
Rated Capacity: 800kVA (high-power density)
Dual Voltage Output: 400kV/1A (serial) or 800kV/1A (parallel)
Excitation Windings: 2×6kV (66.6A each)
Partial Discharge: ≤3pC @ 800kV (≤2pC @ 640kV)
Impedance Voltage: <12% (high efficiency)
Dual-Voltage High-Current Operation
Serial Connection (400kV Mode)
Output: 400kV/1A
Ideal for high-current endurance tests
Lower energy consumption
Parallel Connection (800kV Mode)
Output: 800kV/1A
Maximum voltage capability
For ultra-HV insulation testing
Performance Excellence
Parameter | Specification |
---|---|
Waveform Deviation | ≤3% |
No-load Current | <15% |
Dielectric Loss | <0.5% |
Noise Level | ≤60dB |
Overload Capacity | 1.2A (120%) for 180s |
Overvoltage Withstand | 880kV (110%) for 60s |
Advanced Load Cycling
Standard Test Regimens
2.5nF Load: 650kV, 15min on/15min off
2nF Load: 275kV, 15min on/15min off
3nF Load: 460kV, 15min on/15min off
Daily Cycles: 48 cycles maximum
Integrated Safety Systems
5/5 CT Monitoring: Real-time HV current supervision
6kV Surge Arrestors: Protects excitation windings
Insulation: 20kV/1min (LV) and 5kV/1min (HV) withstand
Measurement: 1000:1 voltage ratio for precision
Industrial Applications
Ultra-HV cable factory testing
GIS (Gas Insulated Switchgear) production
Power transformer qualification
Utility-scale equipment validation
High-power research facilities
Technical Superiority
High-Current Capacity: 1A output for demanding loads
Dual-Voltage Flexibility: 400kV/800kV operation
Precision Measurement: ≤3% waveform deviation
Robust Protection: Withstands 880kV overvoltage
Industrial Duty Cycle: 48 daily test cycles
Operational Guidelines
Strictly adhere to 15min on/off cycles
Monitor SF6 pressure before operation
Verify CT system before high-voltage tests
Use proper PPE for 800kV operation