High Voltage Test Solutions
Persistently developing technology, improving quality, management, and service standards

Gas Insulated Test Transformer

HGTS 1000KV/1600KVA SF6 Test Transformer - Ultra-High Power Industrial Testing System

Industrial-grade 1000KV/1600KVA SF6 test transformer with 2A output current, ≤3% waveform distortion, and ≤10% impedance voltage for heavy-duty electrical testing applications.


  • US$1.00; Negotiated Price
  • Lead time: 120days

>>>WhatsApp Communication<<<

Product Details

Product Tags

HGTS 1000KV/1600KVA SF6 Gas Insulated Test Transformer

This 1600KVA ultra-high power transformer delivers 2A current at 1000KV, featuring exceptional ≤10% impedance voltage and advanced safety monitoring through integrated 5/5 current transformer protection.

Core Specifications

  • Rated Capacity: 1600kVA (heavy-duty industrial)

  • Output Current: 2A at 1000KV

  • Excitation Winding: 3kV/533.3A

  • Waveform Deviation: ≤3%

  • Impedance Voltage: ≤10% (ultra-efficient)

  • Measurement Ratio: 1000:1 precision

Key Performance Features

ParameterSpecification
No-load Current<10%
Frequency50Hz
Insulation MediumSF6 gas
Current Monitoring5/5 CT protection
Casing TypeStationary industrial

Advanced Safety Systems

  • 5/5 CT Monitoring: Real-time HV current supervision (1:1 ratio)

  • Earthed HV Terminal: Operator safety assurance

  • Stationary Casing: Robust industrial-grade construction

Industrial Applications

  • Ultra-high voltage cable manufacturing tests

  • GIS (Gas Insulated Switchgear) production testing

  • Power transformer factory acceptance

  • Utility-scale equipment validation

  • High-power research facilities

Technical Advantages

  1. High-Current Capacity: 2A output for demanding industrial loads

  2. Energy Efficient: ≤10% impedance voltage reduces power losses

  3. Precision Measurement: ≤3% waveform distortion ensures accuracy

  4. Safety Assurance: Integrated CT monitoring system

  5. Reliable Design: Stationary casing withstands industrial environments

Operational Notes

  • Monitor SF6 pressure before operation

  • Verify CT system functionality regularly

  • Use proper HV safety protocols for 1000KV operation

  • Maintain clean, dry environment for optimal performance

>>>WhatsApp Communication<<<

>>>Click To Get Quote<<<

Leave Your Message

Leave Your Message