High Voltage Test Solutions
Persistently developing technology, improving quality, management, and service standards

Gas Insulated Test Transformer

HGTS 1250kV/1250kVA SF6 Test Transformer - Ultra-High Voltage Dual-Mode Testing System

Industrial-grade 1250kV/1250kVA SF6 test transformer featuring dual-voltage output (625kV/1250kV), ≤5pC partial discharge, and 1A current capacity for ultra-high voltage testing applications.


  • US$1.00; Negotiated Price
  • Lead time: 120days

>>>WhatsApp Communication<<<

Product Details

Product Tags

HGTS 1250kV/1250kVA SF6 Gas Insulated Test Transformer

This 1250kVA ultra-high voltage transformer delivers precision performance with dual-voltage operation (625kV or 1250kV) and industry-leading ≤5pC partial discharge in a maintenance-free SF6 design.

Electrical Specifications

  • Rated Capacity: 1250kVA

  • HV Output: 625kV or 1250kV @ 1A

  • LV Windings: 2×3kV/208.3A

  • Frequency: 50Hz

  • Waveform Deviation: ≤3%

Performance Highlights

  • Partial Discharge: ≤5pC @ 1250kV (≤3pC @ 1000kV)

  • Dielectric Loss: <0.5%

  • Noise Level: ≤65dB(A)

  • Impedance Voltage: ≤15%

Dual-Voltage Operation

ConnectionOutputCurrentBest For
Serial625kV1AExtended duration tests
Parallel1250kV1AUltra-HV withstand tests

Advanced Protection Systems

  • 5/5 CT Monitoring: Real-time HV current measurement

  • Overload Protection: 1.2A for 300s (120% rated current)

  • Overvoltage Withstand: 1312.5kV (105%) for 60s

  • Short-Circuit Test: 3×1000kV discharges via damping resistor

Insulation Performance

Dielectric Properties

  • HV-LV winding insulation >1500MΩ

  • 10kV/1min LV winding withstand

  • 5kV/1min HV terminal withstand

Thermal Performance

  • ΔT ≤65K at full load

  • 5min on/30min off duty cycle

  • 20 cycles/day maximum

Industrial Applications

Power Equipment Testing

  • Ultra-HV cable qualification

  • GIS circuit breaker tests

Manufacturing QA

  • Transformer factory tests

  • High-voltage component validation

Operational Guidelines

  • Maintain strict 5min/30min cycling

  • Monitor SF6 pressure before operation

  • Verify CT system functionality

  • Use proper HV safety protocols

>>>WhatsApp Communication<<<

>>>Click To Get Quote<<<

Leave Your Message

Leave Your Message