High Voltage Test Solutions
Persistently developing technology, improving quality, management, and service standards

Gas Insulated Test Transformer

HGTS 750kV/375kVA SF6 Test Transformer - Dual-Frequency Ultra-HV Testing System

Advanced 750kV/375kVA SF6 test transformer with dual-frequency operation (50Hz/200Hz), ≤2pC partial discharge at 750kV, and 1-hour continuous rating for demanding industrial applications.


  • US$ 155,738.00
  • Lead time: 120 days

>>>WhatsApp Communication<<<

Product Details

Product Tags

HGTS 750kV/375kVA SF6 Gas Insulated Test Transformer

This industrial-grade test transformer combines 750kV ultra-high voltage with dual-frequency capability (50Hz/200Hz), delivering exceptional flexibility for high-voltage testing across multiple standards and applications.

Core Specifications

  • Rated Capacity: 375kVA

  • Frequency Range: 50Hz/200Hz operation

  • Dual Voltage Output: 375kV/0.5A (serial) or 750kV/0.5A (parallel)

  • Partial Discharge: ≤2pC @ 750kV (≤1pC @ 550kV)

  • Impedance Voltage: ≤20% @ 50Hz

Dual-Frequency Operation

50Hz Mode

  • Standard power frequency testing

  • IEC/IEEE compliance

  • Impedance voltage ≤20%

200Hz Mode

  • Specialized high-frequency testing

  • Reduced test time for certain applications

  • Ideal for research applications

Performance Specifications

ParameterValue
Waveform Deviation≤3%
No-load Current<10%
Dielectric Loss<0.5%
Noise Level≤60dB
Overvoltage Withstand800kV for 60s
Short-Circuit Test3×600kV discharges

Advanced Operational Capabilities

Standard Operation

  • 1 hour @ 100% rating (750kV/0.5A)

  • 24-hour cooldown required

  • Winding ΔT <75K

Intermediate Operation

  • 120 minutes @ 550kV

  • 12-hour cooldown required

  • For extended partial discharge tests

Premium Insulation System

  • SF6 gas insulation (maintenance-free)

  • Winding-to-ground insulation >2000MΩ

  • Surge arrestor protection system

  • 5/5 CT current monitoring

Industrial Applications

  • Ultra-HV cable testing

  • GIS (Gas Insulated Switchgear) qualification

  • Power transformer factory testing

  • High-voltage research laboratories

  • Renewable energy component testing

Technical Advantages

  1. Dual-Frequency Flexibility: 50Hz/200Hz operation

  2. Unmatched PD Performance: ≤2pC at full voltage

  3. Extended Operation: 1-hour continuous rating

  4. Safety Assurance: Integrated CT monitoring

  5. Robust Design: Withstands 800kV overvoltage

Operational Guidelines

  • Strictly adhere to cooling periods

  • Monitor SF6 pressure before operation

  • Verify CT system functionality

  • Use proper HV safety protocols

>>>WhatsApp Communication<<<

>>>Click To Get Quote<<<

Leave Your Message

Leave Your Message