Gas Insulated Test Transformer
HGTS 600KV/3000KVA SF6 Gas Insulated Test Transformer
Designed for ultra-high-power testing applications, this 3000KVA transformer sets new benchmarks in high-voltage testing with dual-output flexibility, 5A current capacity, and advanced safety monitoring.
Core Specifications
Rated Capacity: 3000kVA (heavy-duty industrial use)
Dual-Voltage Output: 300KV/5A (serial) or 600KV/5A (parallel)
Excitation Windings: 2×6KV (250A each)
Partial Discharge: ≤5pC @ 600KV (≤3pC @ 480KV)
Impedance Voltage: <12% (high efficiency)
Dual-Mode High-Current Operation
Serial Connection (300KV Mode)
Output: 300KV / 5A
Ideal for high-current endurance tests
Optimal for low-impedance load testing
Parallel Connection (600KV Mode)
Output: 600KV / 5A
Maximum voltage for insulation testing
For ultra-high-voltage applications
Performance & Safety Features
Parameter | Specification |
---|---|
Waveform Deviation | ≤3% |
Noise Level | ≤60dB |
Overload Capacity | 6A (120%) for 300s |
Overvoltage Withstand | 660KV (110%) for 60s |
Short-Circuit Test | 3×480KV discharges (no damage) |
Operating Time | 30min @ 100% load (ΔT <65K) |
Advanced Protection Systems
5/5 CT Monitoring: Real-time HV current supervision
3KV Surge Arrestors: Protects excitation windings
Damping Resistor: Handles 480KV short-circuit discharges
Insulation: SF6 gas (maintenance-free) with >1500MΩ resistance
Industrial Applications
Power transformer factory testing
Ultra-high-voltage cable qualification
GIS (Gas Insulated Switchgear) stress testing
Utility-scale substation equipment validation
High-power research laboratories
Why Choose This Transformer?
Unmatched Power: 3000KVA capacity for industrial loads
Dual-Voltage Flexibility: Switch between 300KV and 600KV
High-Current Capability: 5A output for demanding tests
Safety First: Integrated CT monitoring and surge protection
Precision: ≤3% waveform deviation ensures accuracy
Operational Notes
Monitor SF6 pressure before extended operation
Adhere to 30-minute duty cycle for optimal lifespan
Verify CT system functionality before testing
Use proper PPE for 600KV operation