High Voltage Test Solutions
Persistently developing technology, improving quality, management, and service standards

Gas Insulated Test Transformer

HGTS 325KV/162.5KVA SF6 Test Transformer - Advanced Dual-Range HV Testing System

Precision 325KV/162.5KVA SF6 gas insulated test transformer with dual-range output (162.5KV/325KV), ≤5pC partial discharge, and specialized load cycling capabilities for advanced high voltage testing applications.


  • US$ 73,432.00
  • Lead time: 90 days

>>>WhatsApp Communication<<<

Product Details

Product Tags

HGTS 325KV/162.5KVA SF6 Gas Insulated Test Transformer

Engineered for demanding high-voltage testing scenarios, this advanced SF6-insulated transformer delivers precision performance with dual-voltage flexibility and comprehensive safety monitoring.

Key Technical Specifications

  • Rated Capacity: 162.5kVA

  • Voltage Configuration: Dual-range output (162.5KV/325KV)

  • Current Ratings: LV: 2×135.4A / HV: 0.5A

  • Partial Discharge: ≤5pC at 100% rated voltage

  • Waveform Accuracy: <3% deviation

Dual-Voltage Operation System

Serial Connection (Precision Mode)

  • Output: 162.5KV/0.5A

  • Ideal for extended duration tests

  • Optimal for partial discharge measurements

Parallel Connection (High Voltage Mode)

  • Output: 325KV/0.5A

  • Maximum voltage capability

  • For insulation withstand testing

Advanced Performance Features

ParameterSpecification
Impedance Voltage<20%
No-load Current<10%
Dielectric Loss<0.5%
Noise Level<65dB
Overcurrent Withstand0.6A for 300s
Overvoltage Capability357.5KV for 60s

Specialized Load Cycling Capabilities

Standard Test Cycles

  • 800pF load: 275KV, 15min on/15min off (8 cycles/day)

  • 2000pF load (high): 275KV, 2min on/15min off (8 cycles/day)

  • 2000pF load (low): 145KV, 15min on/15min off (8 cycles/day)

Integrated Safety Systems

Current Monitoring Protection

  • 5/5 CT supervision on HV terminal

  • Real-time earth current monitoring

  • Operator safety guarantee system

Surge Protection

  • 0.6kV surge arrestors on exciting winding

  • Withstands 3×275KV discharge tests

  • Damping resistor protection

Laboratory & Industrial Applications

  • High-voltage cable testing

  • Transformer factory acceptance tests

  • Partial discharge research

  • Insulation material development

  • Electrical component endurance testing

Operational Guidelines

For optimal performance and transformer longevity:

  • Adhere strictly to specified load cycling times

  • Monitor SF6 pressure before each test series

  • Verify CT monitoring system functionality

  • Allow proper cooling between test cycles

>>>WhatsApp Communication<<<

>>>Click To Get Quote<<<

Leave Your Message

Leave Your Message