High Voltage Test Solutions
Persistently developing technology, improving quality, management, and service standards

100kv ~ 200kV Range

LAHVF 100kV/10000pF Capacitive Voltage Divider | High-Capacity HV Measurement

100kV/10000pF capacitive voltage divider with ≤0.4% dielectric loss and dual-stage measurement. Features aluminum corona rings, removable base, and ONAN cooling for industrial power testing.


  • US$ 3,616.00
  • Lead time: 30 days

>>>WhatsApp Communication<<<

Product Details

Product Tags

LAHVF 100kV/10000pF Capacitive Voltage Divider

High-capacity solution for industrial power testing featuring 10nF capacitance and dual-stage measurement capability. Engineered for precision in substation monitoring, resonant testing systems, and high-voltage research applications.

Technical Specifications

  • Rated Voltage: 100kV AC RMS

  • Nominal Capacitance: 10,000pF (10nF)

  • Dividing Ratio: 1000:1 (±1% accuracy)

  • Frequency: 50/60Hz (30-300Hz optional)

  • Dielectric Loss: ≤0.4% @ 25°C

  • Insulation Withstand: 110kV/1min (110% rated voltage)

  • Operating Duration: 60 minutes continuous @ 100% voltage

  • Cooling System: ONAN (Oil Natural Air Natural)

Advanced Structural Design

Optimized Construction

  • Aluminum Corona Rings: Lightweight alloy reduces shipping costs while preventing corona discharge

  • Removable Pedestal: Heavy-duty base with quick-release maintenance access

  • Scalable HV Connections: Corona-free terminals support various connector types

  • Modular Design: Field-replaceable components reduce downtime

Measurement System

  • Special Measuring Lead-Wire: Direct interface with variable frequency power sources

  • Dual-Stage Operation: Supports single-stage and series configurations

  • Corona-Free HV Connection: Prevents measurement interference at high voltages

Performance Validation

ParameterTest StandardPerformance
Voltage WithstandIEC 60060-1110kV/1min (110% rated)
Capacitance StabilityIEC 60270±1.2% from 10-100% voltage
Temperature RiseIEEE C57.19.0038°C above ambient @ full load
Phase ErrorIEC 61869-11<5 minutes at 50Hz

Compliance: Meets IEC 61869-11, IEEE C57.13, and ANSI/NETA MTS-2023 standards.

Industrial Applications

Power Transmission

  • EHV substation commissioning

  • Transformer diagnostic testing

  • Switchgear partial discharge analysis

Resonant Testing

  • Cable resonant test systems

  • Large capacitor bank validation

  • GIS (Gas-Insulated Switchgear) testing

Research & Development

  • High-voltage material studies

  • Power electronics prototype testing

  • Renewable energy converter validation

Operational Advantages

  • High-Capacity Measurement: 10,000pF capacitance for energy-intensive applications

  • Thermal Management: ONAN cooling ensures stability during extended tests

  • Measurement Flexibility: Dual-stage configuration for versatile test setups

  • Maintenance Optimized: Removable base enables field servicing

  • Corona-Free Operation: Aluminum rings prevent measurement interference

Installation & Integration

Electrical Connection Protocol

  1. Establish dual 35mm² ground connections to earth grid

  2. Connect special measuring lead-wire to variable frequency source

  3. Select single-stage or dual-stage configuration

  4. Implement corona-free HV connections

  5. Perform step-test at 25%, 50%, 75%, 100% voltage

Foundation Requirements

  • Base Area: Minimum 0.3m² reinforced concrete

  • Anchoring: Four M16 anchor bolts (supplied)

  • Clearance: 2.2m radial clearance at full voltage

Safety & Maintenance

Critical Procedures

  • Pre-Operation Check: Verify oil level and grounding integrity

  • Thermal Monitoring: Continuous temperature tracking during operation

  • Cooling Period: 60-minute cooldown after full-load operation

  • Preventive Maintenance: Bi-annual dielectric fluid analysis

>>>WhatsApp Communication<<<

>>>Click To Get Quote<<<

Leave Your Message

Leave Your Message