<100kVA Range
LQLVF 75kVA/2*125A Power Noise Filter: EMI Suppression for Switchgear Systems
Advanced Noise Filtering for Critical Power Systems
The LQLVF 75kVA/2*125A Power Noise Filter provides industrial-grade electromagnetic interference (EMI) suppression for high-voltage switchgear installations. Engineered to deliver >60dB attenuation across critical frequency bands, this dual-circuit solution ensures operational stability in 0.6kV systems while maintaining<5pc background="" partial="" discharge="" levels.="">
Key Technical Specifications
Parameter | Specification |
---|---|
Rated Voltage | 0.6kV/0.6kV |
Rated Current | 125A × 2 Circuits |
Frequency | 50Hz |
Quality Factor (Reactor) | >70 |
Background PD Level | <5pC |
Attenuation | 40-100kHz: >40dB 100kHz-1MHz: >60dB |
Insulation Level | 18kV/1min |
Critical Performance Features
Ultra-Low Partial Discharge
Maintains <5pC background PD level - essential for preventing insulation degradation in high-voltage environments per IEC 60270 standards.
High-Frequency Attenuation
Delivers >60dB noise suppression in the 100kHz-1MHz range, eliminating harmonics that disrupt sensitive measurement equipment.
Reactor Performance
Filtering reactor with quality factor >70 ensures minimal energy loss while maximizing EMI absorption efficiency.
Installation & Integration
Mounting: Designed for direct integration into sub-stage switchgear cabinets
Weight: 260kg (compact form factor for retrofit applications)
Compliance: Meets IEC 60204-32 safety requirements for electromagnetic compatibility
Industrial Applications
High-voltage substation switchgear
Precision measurement systems requiring EMI-free power
Critical infrastructure protection systems
Industrial plants with sensitive control electronics
Why Choose This Filter?
Dual-Circuit Design: Independent 125A circuits for redundant protection
Dielectric Integrity: 18kV/1min insulation withstand voltage
Precision Manufacturing: Military-grade components for 100,000+ hour MTBF
Maintenance Guidelines
For optimal performance:
Perform annual insulation resistance tests (per IEEE 43)
Verify attenuation characteristics every 24 months
Monitor reactor temperature during peak operations