Transformer Testing Instrument
LQHV-315 Automatic Transformer Test Bench: Comprehensive Testing Solution for Power Transformers
Product Overview
The LQHV-315 is an integrated test platform for power and distribution transformers up to 2500kVA, automating critical tests including:
No-load and load characteristic tests
DC resistance measurement
Voltage ratio and vector group tests
Power frequency withstand voltage tests
Frequency-doubling induction tests
Compliant with Chinese national standards GB/T 4776, GB/T 5169, and GB 4285-1993.
Product Parameters
scanning way:(The instrument has a linear sweep measurement system and a segmented sweep measurement system )
project | Measuring range | relative error |
Voltage | 0.1~600V | ±(0.2% reading +0.1% range) |
current | 0.1~200A | ±(0.2% reading +0.1% range) |
Power | U*I | ±(0.2% reading +0.1% range) |
Power factor | 0.1~0.9999 | 3 Digital |
power supply | AC220V±10% 50Hz±2% | |
Use environment | Operating temperature range 0~40℃ Relative humidity 30%~90% | |
volume | 2500╳1060╳1500(mm) | |
Weight | 100kg~1000kg(Change according to custom requirements) |
Testing Capabilities
1. No-Load & Load Tests
Measures core loss (no-load) and copper loss (load)
Auto-calculates efficiency and voltage regulation
2. DC Resistance Tests
Precision winding resistance measurement
Identifies contact degradation or broken strands
3. Ratio & Vector Group Tests
Verifies turns ratio accuracy
Confirms phase displacement (Dyn11, YNd1, etc.)
4. Withstand Voltage Tests
AC power frequency withstand voltage up to system-rated levels
Timed tests with automatic trip on failure
Technical Advantages
Error Reduction: Microcontroller-synchronized sampling eliminates manual meter reading mistakes
Expandability: External CT interface for future capacity upgrades
Efficiency: Single-platform solution replaces 4+ separate test devices
Compliance Ready: Pre-configured test sequences meet GB standards
Typical Applications
Transformer Manufacturers: Factory acceptance testing (FAT)
Utilities: Preventive maintenance for grid transformers
Industrial Plants: In-service transformer health checks
Laboratories: R&D and quality validation
Why Choose LQHV-315?
Time Savings: 70% faster than manual test setups
Data Integrity: Digital recording eliminates transcription errors
Future-Proof: Modular design supports additional test modules
User Safety: Integrated protection circuits and alarms