High Voltage Test Solutions
Persistently developing technology, improving quality, management, and service standards

Dry Type

HFRS 135kV/135kVA Dry Type Resonant Test System: Three-Stage Modular Solution

Technical specifications of the HFRS 135kV/135kVA three-module dry type resonant test system with flexible configuration options for high voltage equipment testing.


  • US$ 7,378.00
  • Lead time: 30 days

>>>WhatsApp Communication<<<

Product Details

Product Tags

HFRS 135kV/135kVA Dry Type Resonant Test System: Three-Stage Modular Solution

Modular system consisting of three 45kV/45kVA units that can be series-connected for 135kV testing or used independently for lower voltage applications.

System Configuration

ConfigurationVoltagePowerInductanceCurrentWeight
Single Module45kV45kVA132H1A50kg
Three Modules (Series)135kV135kVA396H1A165kg

Key Technical Parameters

  • Frequency Range: 30-300Hz operational bandwidth

  • Continuous Operation: 60 minutes at rated power

  • Thermal Performance:

    • Maximum temperature rise: ≤65K after 60 minutes operation

    • Epoxy tube surface temperature: ≤40K

  • Connection Flexibility: Series or parallel configurations

  • Cooling Method: Natural air cooling (dry type)

Design Features

Modular Construction

  • Three identical 45kV modules

  • Precision-matched components (±2% tolerance)

  • Individual weight: 50kg per module

Dry Type Advantages

  • Epoxy tube insulation system

  • No oil maintenance requirements

  • Environmentally friendly operation

  • Reduced fire hazard

Field Deployment

  • Integrated lifting points on each module

  • Stackable design for transport

  • Configuration-specific nameplates

Performance Comparison

FeatureHFRS Dry TypeConventional Oil Type
MaintenanceMinimal (dry type)Regular oil testing
Weight165kg (3 modules)300kg+ typical
Environmental ImpactNo oil disposalOil handling required

Typical Applications

Medium Voltage Cable Testing

  • 135kV cable withstand testing

  • Partial discharge measurement

Transformer Diagnostics

  • Winding deformation detection

  • Frequency response analysis

Research Laboratory Use

  • Dielectric material evaluation

  • Component testing

Operation & Safety

Installation Requirements

  • Minimum 2m clearance around equipment

  • Adequate ventilation for cooling

  • Level mounting surface

Maintenance Schedule

  • Annual visual inspection of epoxy surfaces

  • Connection check before each use

  • Five-year comprehensive electrical test

>>>WhatsApp Communication<<<

>>>Click To Get Quote<<<

Leave Your Message

Leave Your Message