High Voltage Test Solutions
Persistently developing technology, improving quality, management, and service standards

AC Control System

LQAC-2025 Manual Control System: Precision Control for High-Voltage Testing Applications

Technical specifications for the LQAC-2025 manual control system featuring voltage regulation, timing functions, safety interlocks, and measurement instruments for high-voltage testing.


  • US$ 3,279.00
  • Lead time: 30 days.

>>>WhatsApp Communication<<<

Product Details

Product Tags

LQAC-2025 Manual Control System: Comprehensive Testing Control

Core Measurement Instruments

  • Winding Measurement Voltmeter: Precision monitoring of test transformer windings

  • HV Capacitance Divider Voltmeter: Digital display for high-voltage measurements

  • Input Winding Instruments: Dual-meter system for voltage and current monitoring

Voltage Regulation System

  • Manual Voltage Control: Precision raise/lower voltage functions

  • Position Limiting: Upper/lower limit protection

  • Auto-Return: Automatic return-to-zero function

Safety & Protection Features

FeatureFunction
Emergency StopInstant system shutdown
Audible AlarmVisual and audible fault indication
Door InterlockSafety chain lock prevents operation when open
Over-Current ProtectionAutomatic cutoff during overloads

Testing Functions

  • Withstand Test Timing: Programmable test duration

  • Step Voltage Testing: Manual voltage ramping capability

  • Real-time Monitoring: Simultaneous voltage/current display

Physical Specifications

  • Dimensions: 1050mm (L) × 780mm (W) × 850mm (H)

  • Weight: <50kg

  • Enclosure: Steel construction with IP54 protection

  • Panel Layout: Ergonomically designed control interface

Control Interface Features

  • Analog meters with mirrored scales for reduced parallax error

  • Rotary voltage control with torque feedback

  • Illuminated emergency stop button

  • Test duration timer with automatic shutdown

  • System status indicator lights

Wiring & Connections

TerminalSpecification
Test Transformer50mm² copper lugs
Voltage DividerBNC connectors
GroundingDual 16mm² terminals
Interlocks24V DC safety circuits

Application Scenarios

  • Transformer withstand voltage testing

  • Cable fault location systems

  • Circuit breaker dielectric testing

  • Insulation coordination studies

  • Laboratory high-voltage experiments

Operational Protocol

  1. Verify door interlocks are engaged

  2. Set voltage limits and test duration

  3. Manually ramp voltage at 1kV/s maximum rate

  4. Monitor instruments during test phase

  5. Activate auto-return post-test

  6. Disconnect power before accessing test area

Compliance & Safety Standards

  • IEC 61010-1: Safety requirements

  • IEC 60060: High-voltage test techniques

  • EN 60204: Safety of machinery

  • ANSI/ISA 82.02: Electrical test equipment

>>>WhatsApp Communication<<<

>>>Click To Get Quote<<<

Leave Your Message

Leave Your Message