Sphere Gap
LQHSG250 250mm Horizontal Sphere Gaps for High Voltage Testing
Product Overview
The LQHSG250 horizontal sphere gap system provides laboratory-grade high voltage measurement with 250mm diameter polished copper spheres. Designed for measurements up to 275kV, this IEC 60052-compliant instrument delivers ±3% accuracy for impulse, AC, and DC voltage calibration.
Technical Specifications
Parameter | Specification |
---|---|
Sphere Diameter | 250mm (±0.05mm tolerance) |
Maximum Voltage Rating (1.2/50μs) | 275kV at 125mm spacing (0.5×D) |
Height Adjustment Range | 1.76m vertical travel |
Base Frame Dimensions | 2.6m × 0.7m (L×W) |
Total Weight | 60kg (net) |
Gap Adjustment Accuracy | ±0.5mm precision scale |
Measurement Accuracy | ±3% (per IEC 60052) |
Key Features
Precision Engineering
Mirror-polished 250mm copper spheres (Ra ≤ 0.2μm)
Precision ground stainless steel adjustment mechanism
0.5mm resolution gap setting scale
Versatile Measurement Capabilities
Simultaneous measurement of:
Lightning impulse (1.2/50μs)
AC peak voltages
DC voltages
Optional chopping device for impulse wave termination
Safety & Compliance
Full compliance with IEC 60052 standards
Insulating columns rated for 300kV BIL
Interlocked safety system (optional)
Optional Chopping Device
The system can be equipped with a precision wave-chopping attachment:
Parameter | Specification |
---|---|
Triggering Method | Electronic ignition with adjustable delay |
Delay Time Range | 1μs - 5μs (8 programmable steps) |
Time Dispersion | ≤ 0.1ms |
Power Requirements | 230V AC, 50/60Hz |
Trigger Sphere | Includes built-in ignition rod |
Note: For chopping operation, one measuring sphere must be replaced with the trigger sphere.
Installation Requirements
Space Requirements: Minimum 4m × 3m laboratory space recommended
Environmental Conditions: Temperature 15-25°C, humidity ≤60% RH
Foundation: Level concrete floor or vibration-isolated platform
Safety Clearances: Maintain minimum 2m clearance to walls/objects
Typical Applications
Calibration of HV dividers and measuring systems
Research and development in high voltage engineering
Quality assurance testing of power equipment
Educational demonstrations in university HV labs
Verification of impulse generator outputs
Maintenance & Calibration
Quarterly sphere surface inspection and cleaning
Annual verification of gap adjustment accuracy
3-year recalibration recommended
Use only approved cleaning solvents (isopropyl alcohol)