High Voltage Test Hall
Faraday Cage Construction: Essential Planning for High Voltage Test Labs
Proper Faraday cage implementation is critical for electromagnetic shielding in high voltage test laboratories. This guide outlines key specifications and design considerations when ordering your customized enclosure.
1. Laboratory Structural Requirements
Space Configuration
Main Lab Dimensions: Provide length/width/height of planned test area
Door Specifications: Required width/height and electromagnetic sealing class
Building Type: New construction vs. retrofitting existing structure
Control Room Integration
Preferred location relative to test area
Required dimensions and window specifications
Shielded conduit requirements for cabling
2. Technical Infrastructure Specifications
Material Handling
Crane Requirements: Capacity (typically 2-10 tons), span, and lift height
Load-Bearing: Roof structural capacity for suspended equipment
Environmental Systems
HVAC specifications (air changes/hour, filtration)
Lighting intensity and EMI-protected fixtures
Special ventilation needs for test equipment
3. Safety & Compliance Features
Grounding: Required grounding points and resistance values
Fire Protection: Preferred suppression system (gas/foam/sprinkler)
Insulation: Wall/floor/ceiling dielectric requirements
Emergency access and egress paths
4. Design Documentation Requirements
Existing building diagrams (for retrofit projects)
Test equipment layout with dimensions
Preferred shielding materials and construction methods
Electrical penetration details
Planning Your Faraday Cage Installation
For optimal results, provide:
Detailed test equipment inventory with power requirements
Maximum test voltage levels and frequencies
Required shielding effectiveness (dB attenuation)
Future expansion considerations
Professional Design Assistance
Our engineering team can develop turnkey solutions including:
3D lab layout simulations
EMI shielding performance modeling
Customized safety system integration