High Voltage Test Solutions
Persistently developing technology, improving quality, management, and service standards

Impulse Current Generator

2ms Energy Screening Test System for MOV Arresters | 150A-2200A | IEC 60099-4 Compliant

IEC 60099-4 compliant 2ms energy screening system for MOV arresters (150A-2200A). Features triple-test terminals, automated cooling, and 50kV charging.


  • US$0.00 Negotiated Price
  • Lead time: 60days

>>>WhatsApp Communication<<<

Product Details

Product Tags

2ms Energy Screening Test System for MOV Arresters (150A-2200A)

This automated test system identifies defective ZnO varistor elements during production using 2ms rectangular impulses (150A-2200A) per IEC 60099-4 standards, featuring sequential testing across three terminals with integrated cooling.

Key Specifications

ParameterCircuit 1Circuit 2Circuit 3
Capacitance8μF16μF2μF
Charging Voltage30kV30kV35kV
Current Peak850A1700A150A
Waveform2-2.4ms (±20%)2ms

System Configuration

Core Components

  • Charging System: 50kV/40kVA transformer (1A max current)

  • Energy Storage: Multi-bank capacitors (2-16μF)

  • Waveform Control:

    • Adjustable inductors (0.5mH-8mH multi-tap)

    • Impedance matching resistors (1-100Ω)

  • Test Terminals: 3-position turntable (10s charge time)

IEC 60099-4 Compliance

  • Peak duration: 100-120% of specified value

  • Total duration ≤150% of peak duration

  • Overshoot ≤10% of peak current

  • Precise disconnection timing (1-2× total duration after zero-cross)

Measurement & Control

ComponentSpecification
Current Transformer5000A through-type (100-5000A primary, 5A secondary)
Voltage Divider25kV/250V resistive
Test IntervalAdjustable 10-99s (software controlled)
Pulse Rate6 pulses/minute (max)

Automated Safety Features

  • Cooling System:

    • Forced-air cooling with directional fans

    • Non-contact temperature monitoring (<50°C threshold)

    • High-temperature alerts

  • Sequential Discharge: Turntable automates element handling

  • Isolated Design: Protected test compartments

Testing Workflow

  1. Load MOV elements onto turntable

  2. System automatically:

    • Positions element at test terminal

    • Charges capacitors (

      <10s)<>

    • Applies 2ms impulse

  3. Measures:

    • Peak current (150-2200A range)

    • Waveform parameters (Tf/Tt)

    • Energy absorption

  4. Cools elements before discharge (auto-triggered if >50°C)

  5. Rotates turntable to next test position (1-5min intervals)

Why This System?

  • High-Throughput: Tests 3 elements simultaneously (1 test/minute)

  • Precision Waveform: Meets strict IEC 60099-4 duration/overshoot requirements

  • Operator Safety: Automated handling of hot elements

  • Flexible Configuration: Adjustable L/C components for different MOV grades

Conclusion

This 2ms energy screening system provides complete production-line testing of MOV arresters per IEC 60099-4, combining high-current impulses (up to 2200A) with automated element handling and temperature-controlled safety. The triple-test-terminal design ensures efficient quality control for ZnO varistor manufacturing.

>>>WhatsApp Communication<<<

>>>Click To Get Quote<<<

Leave Your Message

Leave Your Message